Featured Project Return to Projects List
R.E. French Family Education Foundation
Project Information
- Project Location:
- Gridley, KS
- Status:
- Completed - Jul 2009
- Structure Type:
- Office Building
Scope Of Work
Roof and Wall Treatments:
TPO Roof System with Pre-Finished Smart Siding and Stone Veneer.
Special Features:
SIP’s (structural insulated panels) exterior wall system with an R-24.7 insulation value that provides a superior insulation factor and savings of two weeksconstruction labor. The TPO, Smart Siding and Stone Veneer provide a virtually maintenance free exterior.Building is total electric with an air source heat pump for heating and cooling. A solar tube was installed in the lobby for natural lighting. The building was designed and constructed to meet Energy Star Ratings.
Special Needs:
Energy efficient design. A poured concrete wall and ceiling Safe Room for records and emergency shelter.
End Use:
facility for the foundation offices.
Client:
An education foundation established by the late R. E. French as a means to help graduating high school students in East Central Kansas further their education through scholarships and grants.