Florida Design Contractors, Inc.

Lake Park, FL 33403-1919

Company Info

  • Est. 1979
  • Size 50-99 Employees
  • Annual Vol $10 million - $20 million

Featured Project Return to Projects List

Seminole County WWTF

Project Information

Project Location:
Seminole County, FL
Approx Contract:
$9,000,000
Status:
Completed
Structure Type:
Misc Project

References

Owner:
Seminole County, Florida

Scope Of Work

This project included a complete plant(s) upgrade to a full capacity of 3.5 MGD.

The upgrades for the Greenwood Lakes WRF included; removal of the existing dewatering equipment and replacement with a belt filter press system, dewatering building structural and architectural upgrades, and electrical and PLC modifications.

The Yankee Lake WRF upgrades included; construction of a new (5) dry-pit submersible equalization pump station, construction of a 1.7 MG pre-stressed concrete ground storage tank equalization basin, fine bubble diffused aeration and gate modifications to an existing BNR Basin, construction of a (3) submersible pump belt filter press lift station, addition of a hydraulic mixing (2) pump station and aeration modifications to (2) sludge holding tanks, construction of a new (5) belt filter feed and return pump station, construction of a new pre-manufactured dewatering building and associated belt filter feed press system, construct a new MCC Building and electrical upgrades, yard piping, and site improvements.

Share URL copied!
https://www.thebluebook.com/iProView/443/florida-design-contractors-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.