Florida Design Contractors, Inc.
Lake Park, FL 33403-1919
Featured Project Return to Projects List
Marco Island RWPF Headworks Replacement
Project Information
- Project Location:
- Marco Island, FL
- Approx Contract:
- $6,000,000
- Status:
- Completed
- Structure Type:
- Misc Project
References
- Owner:
- City of Marco Island, Florida
Scope Of Work
This projected incorporated a new headworks facility to the City’s existing 3.5 MGD plant.
The cast-in-place concrete headworks facility included; an influent flow meter assembly, (3) in-channel drum screens, sluice and weir gates, diversion of influent and effluent piping from the old headworks to the new headworks, a biological odor control system which associated foul air FRP ductwork, influent channel coatings and electrical and I&C upgrades. Once the new headworks facility was fully operational, we proceeded to demolish the existing headworks facility.
The project also included converting an existing empty pre-stressed concrete ground storage tank into an influent raw sewage storage tank with a blower, SS air piping and fine-bubble diffusers.
Previous