Felix Construction Co.
Coolidge, AZ 85128
Featured Project Return to Projects List
Aquifer Storage Recovery (ASR) Wells Program
Project Information
- Project Location:
- Phoenix, AZ
- Approx Contract:
- $30,000,000
- Status:
- In-Progress - Jul 2022
- Structure Type:
- Storage Facility / Warehouse
References
- Owner:
- City of Phoenix
Scope Of Work
The ASR Wells Program consists of drilling and developing 7 new ASR Wells, equipping 8 ASR Wells, the drilling of 5 new monitoring wells, and the re-purposing of 3 water production wells into monitoring wells. The water production goal is approximately 2,000 gpm for each well with a recharge goal of 60%, or approximately 1,200 gpm. the recharge water comes from the City’s water distribution system the water must be dechlorinated before recharging into the aquifer. When the water demands require discharge into the distribution system the water has to be chlorinated. These facilities are designed and equipped with both chlorination and dechlorination systems. Many of the wells have well pump motors ranging from 500HP to 900HP and require an increased utility entrance section (SES). These wells are d with a medium voltage (4160 V) power supply thus necessitating an increased electrical equipment requirement. These wells are fully incorporated into the City’s SCADA system and the remaining of the well equipping is typical of a water production well.