01 00 00 - General Requirements
01 35 00 - Special Procedures
01 35 43 - Environmental Procedures
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 57 00 - Temporary Controls
01 57 23 - Temporary Storm Water Pollution Control
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 78 00 - Closeout Submittals
01 78 29 - Final Site Survey
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 81 00 - Facility Performance Requirements
01 81 16 - Facility Environmental Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 00 00 - Existing Conditions
02 01 00 - Maintenance of Existing Conditions
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 20 00 - Assessment
02 20 00.00.01 - Assessment
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 24 00 - Environmental Assessment
02 24 13.73 - Land Assessment
02 24 23 - Chemical Sampling and Analysis of Soils
02 24 43 - Transboundary and Global Environmental Aspects Assessment
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 26 00 - Hazardous Material Assessment
02 26 36 - Hazardous Waste Drum Assessment
02 30 00 - Subsurface Investigation
02 30 00.00.01 - Subsurface Investigation
02 31 00 - Geophysical Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 23 - Geotechnical Monitoring Before Construction
02 50 00 - Site Remediation
02 50 00.00.01 - Site Remediation
02 51 00 - Physical Decontamination
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 00 - Chemical Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 00 - Thermal Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 00 - Biological Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00 - Remediation Soil Stabilization
02 55 00.00.01 - Remediation Soil Stabilization
02 56 00 - Site Containment
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 60 00 - Contaminated Site Material Removal
02 60 00.00.01 - Contaminated Site Material Removal
02 61 00 - Removal and Disposal of Contaminated Soils
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 00 - Hazardous Waste Recovery Processes
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 00 - Water Decontamination
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 80 00 - Facility Remediation
02 80 00.00.01 - Facility Remediation
02 81 00 - Transportation and Disposal of Hazardous Materials
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 00 - Polychlorinate Biphenyl Remediation
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00 - Hazardous Waste Drum Handling
02 86 00.00.01 - Hazardous Waste Drum Handling
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 00 00 - Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
11 92 00 - Agricultural Equipment
11 92 23 - Agricultural Waste Clean-Up Equipment
13 00 00 - Special Construction
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 00 00 - Fire Suppression
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
22 00 00 - Plumbing
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
22 31 00 - Domestic Water Softeners
22 31 13 - Residential Domestic Water Softeners
22 31 16 - Commercial Domestic Water Softeners
22 32 00 - Domestic Water Filtration Equipment
22 32 13 - Domestic-Water Bag-Type Filters
22 32 16 - Domestic-Water Freestanding Cartridge Filters
22 32 19 - Domestic-Water Off-Floor Cartridge Filters
22 32 23 - Domestic-Water Carbon Filters
22 32 26 - Domestic-Water Sand Filters
22 32 26.13 - Domestic-Water Circulating Sand Filters
22 32 26.16 - Domestic-Water Multimedia Sand Filters
22 67 00 - Processed Water Systems for Laboratory and Healthcare Facilities
22 67 13.16 - Reverse-Osmosis Water Piping
22 67 13.19 - Deionized-Water Piping
22 67 19 - Processed Water Equipment for Laboratory and Healthcare Facilities
22 67 19.13 - Distilled-Water Equipment
22 67 19.16 - Reverse-Osmosis Water Equipment
22 67 19.19 - Deionized-Water Equipment
23 00 00 - Heating, Ventilating, & Air Conditioning
23 01 00 - Operation and Maintenance of HVAC Systems
23 01 60.71 - Refrigerant Recovery/Recycling
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
23 22 00 - Steam and Condensate Piping and Pumps
23 22 13.13 - Underground Steam and Condensate Heating Piping
23 25 00 - HVAC Water Treatment
23 25 13 - Water Treatment for Closed-Loop Hydronic Systems
23 25 16 - Water Treatment for Open Hydronic Systems
23 25 19 - Water Treatment for Steam System Feedwater
23 25 23 - Water Treatment for Humidification Steam System Feedwater
23 51 00 - Breechings, Chimneys, and Stacks
23 51 43.16 - Particulate Filtration
25 00 00 - Integrated Automation
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
26 00 00 - Electrical
26 05 00 - Common Work Results for Electrical
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
27 00 00 - Communications
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
28 00 00 - Electronic Safety & Security
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 00 00 - Earthwork
31 01 00 - Maintenance of Earthwork
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 00 - Schedules for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 13.13 - Groundwater Monitoring During Construction
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 11 00 - Clearing and Grubbing
31 11 00.00.01 - Clearing and Grubbing
31 12 00 - Selective Clearing
31 12 00.00.01 - Selective Clearing
31 14 00 - Earth Stripping and Stockpiling
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00 - Earth Moving
31 20 00.00.01 - Earth Moving
31 21 00 - Off-Gassing Mitigation
31 21 16.13 - Methane Venting
31 22 00 - Grading
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 00 - Excavation and Fill
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
32 70 00 - Wetlands
32 70 00.00.01 - Wetlands
33 00 00 - Utilities
33 01 00 - Operation and Maintenance of Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 00 - Schedules for Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 40.13 - Storm Drainage Schedule
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 09 00 - Instrumentation and Control for Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 00 - Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 29 00 - Well Abandonment
33 29 00.00.01 - Well Abandonment
33 31 00 - Sanitary Utility Sewerage Piping
33 31 16 - Industrial Waste Utility Sewerage Piping
33 33 00 - Low Pressure Utility Sewerage
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 00 - Sanitary Utility Sewerage Force Mains
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 00 - Storm Utility Drainage Piping
33 41 13 - Public Storm Utility Drainage Piping
33 44 00 - Storm Utility Water Drains
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 50 00 - Fuel Distribution Utilities
33 50 00.00.01 - Fuel Distribution Utilities
33 51 00 - Natural-Gas Distribution
33 51 13 - Natural-Gas Piping
33 60 00 - Hydronic and Steam Energy Utilities
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 00 - Hydronic Energy Distribution
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 00 - Steam Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00 - Electrical Utilities
33 70 00.00.01 - Electrical Utilities
33 71 00 - Electrical Utility Transmission and Distribution
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 00 - Site Grounding
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
35 41 00 - Levees
35 41 16 - Levee Cutoff Trenches
40 00 00 - Process Integration
40 23 00 - Water Process Piping
40 23 36 - Sanitary Water Process Piping
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
43 32 00 - Gas and Liquid Purification Process Equipment
43 32 56 - Reverse-Osmosis Purification Units
43 32 66 - Vacuum Degasifiers
43 32 69 - Chemical Feed Systems
43 32 76 - Chlorination Equipment
44 00 00 - Pollution Control Equipment
44 01 00 - Operation and Maintenance of Pollution Control Equipment
44 01 40 - Operation and Maintenance of Water Treatment Equipment
44 06 00 - Schedules for Pollution Control Equipment
44 06 40 - Schedules for Water Treatment Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 40 - Commissioning Water Treatment Equipment
44 40 00 - Water Treatment Equipment
44 40 00.00.01 - Water Treatment Equipment
44 42 00 - General Water Treatment Equipment
44 42 13 - Aeration Water Treatment Equipment
44 42 16 - American Petroleum Institute Separators
44 42 19 - Water Treatment Blowers
44 42 23 - Water Treatment Clarifiers
44 42 26 - Water Treatment Comminutors
44 42 29 - Water Treatment Compressors
44 42 33 - Water Treatment Digesters
44 42 36 - Water Treatment Dissolved Air Flotation Equipment
44 42 39 - Water Treatment Grit Collectors
44 42 43 - Water Treatment Induced Air Flotation Equipment
44 42 46 - Water Treatment Mixers
44 42 49 - Water Treatment Oil/Grease Interceptors
44 42 53 - Water Treatment Oil/Water Separators
44 42 56 - Water Treatment Pumps
44 42 59 - Water Treatment Reactors
44 42 63 - Water Treatment Sediment Removal Equipment
44 42 66 - Water Treatment Skimmers
44 42 73 - Water Treatment Tanks/Tank Liners
44 43 00 - Water Filtration Equipment
44 43 13 - Water Filters
44 43 13.13 - Bag Water Filters
44 43 13.16 - Cartridge Water Filters
44 43 13.19 - Fabric Water Filters
44 43 13.23 - Multimedia Water Filters
44 43 13.26 - Packaged Water Filters
44 43 23 - Water Filter Presses
44 43 26 - Rotary-Drum Water Filtration Equipment
44 43 33 - Water Filtration Screens
44 43 36 - Vacuum Water Filtration Equipment
44 44 00 - Water Treatment Chemical Systems Equipment
44 44 13 - Water Treatment Chemical Feed Equipment
44 44 16 - Water Chlorinators
44 44 19 - Water Coagulators
44 44 23 - Water Dechlorinators
44 44 26 - Dissolved-Solids Water Treatment Equipment
44 44 29 - Water Emulsifiers
44 44 33 - Water Emulsion Crackers
44 44 36 - Water Flocculators
44 44 39 - Water Fluoridation Equipment
44 44 43 - Water Heavy Metals Treatment Equipment
44 44 46 - Water Hydrothermal Equipment
44 44 49 - Water Oils Treatment Equipment
44 44 53 - Water Oxidation/Reduction Equipment
44 44 56 - Water Ozone Equipment
44 44 59 - Water pH Adjustment Equipment
44 44 63 - Water Polymers Equipment
44 44 66 - Water Precipitators
44 44 69 - Water Pretreatment Equipment
44 44 73 - Water Ultraviolet Radiation Equipment
44 45 00 - Water Treatment Biological Systems Equipment
44 45 13 - Water Biofilters
44 45 16 - Water Bubble Membrane Diffusers
44 46 00 - Sludge Treatment and Handling Equipment for Water Treatment Systems
44 46 13 - Sludge Conveyors
44 46 19 - Sludge Digesters
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation