Company Info

  • Est. 1969
  • Size 50-99 Employees
  • Annual Vol $20 million - $50 million
  • DUNS # 080126882

Featured Project Return to Projects List

Jaime J. Zapata Boat Ramp, Pier & Kayak Launch Pad

Project Information

Project Location:
Brownsville, TX
Approx Contract:
$150,000
Status:
Completed
Structure Type:
Misc Project

Scope Of Work

AWARDS:

ABC South Texas Excellence in Construction Award
 

MARKET:

Government
 

DELIVERY METHOD:

Job Order Contract
 

TYPE OF CONSTRUCTION:

Salt Water Construction
 

PROJECT SIZE:

1,500SF
 

PROJECT VALUE:

$124,883
 

PROJECT OVERVIEW:

The construction phase began by drilling piles 20 feet into the water bed with a hydraulic pile driver to create the structural foundation of the fishing pier. Due to the starting period of the project (when high tide is during the day and low tide is at night) the subcontractor had to utilize multiple methods to install the lumber framework of the pier. This included using floating barges and cranes. Both the lumber and fixings had to be specially treated for protection against exposure to salt water. A cofferdam was created to allow the subcontractor to construct the concrete kayak ramp and with aluminum railing. Finally solar lights were installed to allow safety and security for night fishing. 
 

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/5722/alpha-building-corporation/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.