Logo

Shaum Electric Co., Inc.

Elkhart, IN 46514

Company Info

  • Est. 1945
  • Size 10-19 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Shaum Electric is Elkhart's best electrician and most experienced electrical contractor. Established in 1945, Shaum continues to be a financially solid company serving all of the Michiana area.

Electrical Contracting serving the Michiana Area for over 70 Years. We serve Elkhart Indiana, South Bend Indiana, Mishawaka Indiana, Northern Indiana and Southern Michigan.

Skilled and Trained Technicians. Licensed / Bonded / Insured

Shaum Electric is an electrician and electrical contractor that provides electrical service and electrical repair. 
We sell and repair AC drives, DC drives, AC motors, DC motors, vector drives, pool pumps, surge suppressors, motor controls, control panels, irrigation pumps, generators and more. 
We also offer residential and commercial wiring, design build, and power factor correction. 
We work with the following brands and more: Baldor Motors, Leeson Motors, World Wide Motors, Tech Top Motors, Briggs & Stratton, Kohler, Gillette, Generac, Lennox, and Honda.

What We Do

Commercial Experience

Regions & Counties Serviced

  • Indiana - Indianapolis and Vicinity

Indiana 5

  • Adams
  • Allen
  • Elkhart
  • Lagrange
  • St Joseph

Michigan 17

  • Berrien
  • Branch
  • Calhoun
  • Cass
  • Hillsdale
  • Jackson
  • Kalamazoo
  • Lenawee
  • Livingston
  • Macomb
  • Monroe
  • Oakland
  • Saint Clair
  • Saint Joseph
  • Van Buren
  • Washtenaw
  • Wayne

Our CSI Codes

01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
13 50 00.00.01 - Special Instrumentation
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
23 09 13 - Instrumentation and Control Devices for HVAC
23 09 13.13 - Actuators and Operators
23 09 13.23 - Sensors and Transmitters
23 09 23 - Direct-Digital Control System for HVAC
23 09 33 - Electric and Electronic Control System for HVAC
23 09 43 - Pneumatic Control System for HVAC
23 09 53 - Pneumatic and Electric Control System for HVAC
23 09 93 - Sequence of Operations for HVAC Controls
25 01 10 - Operation and Maintenance of Integrated Automation Network Equipment
25 01 20 - Operation and Maintenance of Integrated Equipment
25 01 30 - Operation and Maintenance of Integrated Automation Instrumentation and Terminal Devices
25 01 90 - Diagnostic Systems for Integrated Automation
25 05 26 - Grounding and Bonding for Integrated Automation
25 05 53 - Identification for Integrated Automation
25 06 11 - Schedules for Integrated Automation Network
25 06 12 - Schedules for Integrated Automation Network Gateways
25 06 13 - Schedules for Integrated Automation Control and Monitoring Network
25 06 14 - Schedules for Integrated Automation Local Control Units
25 06 30 - Schedules for Integrated Automation Instrumentation and Terminal Devices
25 08 00.00.01 - Commissioning of Integrated Automation
25 30 00.00.01 - Integrated Automation Instrumentation and Terminal Devices
25 31 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Facility Equipment
25 35 19 - Integrated Automation Control Valves
25 35 26 - Integrated Automation Compressed Air Supply
25 36 16 - Integrated Automation KW Transducers
25 36 19 - Integrated Automation Current Sensors
25 38 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Electronic Safety and Security Systems
25 51 00.00.01 - Integrated Automation Control of Facility Equipment
25 55 00.00.01 - Integrated Automation Control of HVAC
25 56 00.00.01 - Integrated Automation Control of Electrical Systems
25 90 00.00.01 - Integrated Automation Control Sequences
25 91 00.00.01 - Integrated Automation Control Sequences for Facility Equipment
25 95 00.00.01 - Integrated Automation Control Sequences for HVAC
25 96 00.00.01 - Integrated Automation Control Sequences for Electrical Systems
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 01 30 - Operation and Maintenance of Facility Electrical Power Generating and Storing Equipment
26 05 73 - Overcurrent Protective Device Coordination Study
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 06 30 - Schedules for Facility Electrical Power Generating and Storing Equipment
26 08 00.00.01 - Commissioning of Electrical Systems
26 09 23 - Lighting Control Devices
26 09 36 - Modular Dimming Controls
26 09 36.13 - Manual Modular Dimming Controls
26 09 36.16 - Integrated Multipreset Modular Dimming Controls
26 09 43 - Network Lighting Controls
26 09 43.13 - Digital-Network Lighting Controls
26 09 43.16 - Addressable Fixture Lighting Control
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 24 19 - Motor-Control Centers
26 26 00.00.01 - Power Distribution Units
26 32 13 - Engine Generators
26 32 13.13 - Diesel-Engine-Driven Generator Sets
26 32 13.16 - Gas-Engine-Driven Generator Sets
26 32 16 - Steam-Turbine Generators
26 32 19 - Hydro-Turbine Generators
26 32 33 - Rotary Uninterruptible Power Units
26 33 23 - Central Battery Equipment
26 33 33 - Static Power Converters
26 33 46 - Battery Monitoring
26 33 53 - Static Uninterruptible Power Supply
26 35 33 - Power Factor Correction Equipment
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
27 08 00.00.01 - Commissioning of Communications
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 71 26.13 - Capacitor Banks
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
34 43 26.13 - Airfield Lighting Control Equipment
34 43 26.16 - Airfield Lighting PLC Control Equipment
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
40 90 00.00.01 - Instrumentation and Control for Process Systems
40 92 49 - Variable Frequency Drives
40 94 23 - Distributed Process Control Systems
40 94 43 - Programmable Logic Process Controllers
40 95 73 - Process Control Wiring
41 08 30 - Commissioning of Manufacturing Equipment
41 65 16 - Mobile Generators
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
42 14 16 - Atmosphere Generators
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 01 10 - Operation and Maintenance of Electrical Power Generation Equipment
48 01 70 - Operation and Maintenance of Electrical Power Generation Testing
48 05 00.00.01 - Common Work Results for Electrical Power Generation
48 06 10 - Schedules for Electrical Power Generation Equipment
48 06 70 - Schedules for Electrical Power Generation Testing
48 08 00.00.01 - Commissioning of Electrical Power Generation
48 09 00.00.01 - Instrumentation and Control for Electrical Power Generation
48 10 00.00.01 - Electrical Power Generation Equipment
48 11 26 - Fossil Fuel Electrical Power Plant Generators
48 12 23 - Nuclear Fuel Electrical Power Plant Steam Generators
48 12 33 - Nuclear Fuel Electrical Power Generators
48 13 16 - Hydroelectric Power Plant Electrical Power Generators
48 16 23 - Geothermal Energy Electrical Power Generators
48 17 13 - Electrical Power Generation Batteries
48 18 13 - Electrical Power Generation Fuel Cells
48 19 13 - Electrical Power Generation Battery Charging Equipment
48 19 23 - Electrical Power Generation Transformers
48 19 26 - Electrical Power Generation Voltage Regulators

Gallery

Featured Image 1
Auto Zone
Featured Image 2
The South Bend Clinic
Featured Image 3
Earth Bound
Featured Image 4
Services

Associations & Memberships

NECA (National Electrical Contractors Assn.)
NECA (National Electrical Contractors Assn.)
Home Advisor Screened & Approved
Home Advisor Screened & Approved

Preferred Brands

Briggs & Stratton
Briggs & Stratton
Honda
Honda
Lennox
Lennox
Generac Power Systems
Generac Power Systems
Gillette Generators
Gillette Generators
Kohler Engines
Kohler Engines
Leeson
Leeson
Baldor
Baldor
Share URL copied!
https://www.thebluebook.com/iProView/510458/shaum-electric-co-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.