Featured Project Return to Projects List
Repair Mess Hall Building B-14036 – MCB Camp Pendleton
Project Information
- Project Location:
- CA
- Status:
- Completed
- Structure Type:
- Government
Scope Of Work
Pacific West Builders recently completed the design build contract to renovate and repair the 17,000-square foot mess hall building 14036 at the MCB Camp Pendleton. The mess hall was in a poor condition and required a new roof system, plumbing, HVAC, various electrical requirements, a new communications room and system, new beverage, food bars and serving lines, a new fire alarm mass notification system, and new finishes in the kitchen and dining room.
During construction, structural issues and mold were found. New steel columns and beams had to be installed and mold remediated before the installation of the new finishes could be completed. New finishes included ceramic tile floors and walls, acoustic ceilings, drywall ceilings, soffits and walls, light fixtures, paint and wallcoverings. The finishes in the kitchen had to be upgraded to comply with health code requirements.