01 00 00 - General Requirements
01 32 00 - Construction Progress Documentation
01 32 23 - Survey and Layout Data
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 57 00 - Temporary Controls
01 57 23 - Temporary Storm Water Pollution Control
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 00 00 - Existing Conditions
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 00 - Geophysical Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 00 00 - Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
13 00 00 - Special Construction
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 00 00 - Fire Suppression
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
22 00 00 - Plumbing
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
22 13 00 - Facility Sanitary Sewerage
22 13 23 - Sanitary Waste Interceptors
22 13 26 - Sanitary Waste Separators
22 13 29.33 - Sewerage Pump Basins and Pits
22 13 36 - Packaged, Wastewater Pump Units
22 13 43 - Facility Packaged Sewage Pumping Stations
22 13 43.13 - Facility Dry-Well Packaged Sewage Pumping Stations
22 13 43.16 - Facility Wet-Well Packaged Sewage Pumping Stations
22 14 00 - Facility Storm Drainage
22 14 29.19 - Sump-Pump Basins and Pits
23 00 00 - Heating, Ventilating, & Air Conditioning
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
25 00 00 - Integrated Automation
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
26 00 00 - Electrical
26 05 00 - Common Work Results for Electrical
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
27 00 00 - Communications
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
28 00 00 - Electronic Safety & Security
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 00 00 - Earthwork
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
33 00 00 - Utilities
33 06 00 - Schedules for Utilities
33 06 40.13 - Storm Drainage Schedule
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 12 00 - Water Utility Distribution Equipment
33 12 23 - Water Utility Pumping Stations
33 32 00 - Wastewater Utility Pumping Stations
33 32 13 - Packaged Utility Lift Stations
33 32 13.13 - Packaged Sewage Lift Stations, Wet Well Type
33 32 16 - Packaged Utility Wastewater Pumping Stations
33 32 16.13 - Packaged Sewage Grinder Pumping Units
33 32 19 - Public Utility Wastewater Pumping Stations
33 44 00 - Storm Utility Water Drains
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 00 00 - Process Integration
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
41 14 00 - Batching Equipment
41 14 16 - Batch Cars/Transports
41 14 19 - Batch Hoppers
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 00 00 - Pollution Control Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 40 - Commissioning Water Treatment Equipment
44 41 00 - Packaged Water Treatment
44 41 13 - Packaged Water Treatment Plants
44 41 13.13 - Chemical Packaged Water Treatment Plants
44 41 13.16 - Biological Packaged Water Treatment Plants
44 41 13.19 - Thermal Packaged Water Treatment Plants
44 46 00 - Sludge Treatment and Handling Equipment for Water Treatment Systems
44 46 26 - Sludge Thickeners
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation