Logo

Martin Brothers Construction

Share

Sacramento, CA 95826

Company Info

  • Est. 1996
  • Size 100-249 Employees
  • Annual Vol $20 million - $50 million

People Also View These
Loading...

Our Story

Since 1996, Martin Brothers Construction has been commitment to building some of America’s greatest infrastructure projects including highways, runway, bridges, levees, and spillways. Martin Brothers has been recognized as one of the fastest growing companies in the U.S., Martin Brothers specializes in complex infrastructure projects and provides award-winning construction services in earthwork, water/sewer, runway, highway, and bridge construction.mble beginnings, but quickly progressed into a well established general contractor with a highly regarded reputation as an employer and contributor to the community.  

Today, MBC is certified as a Small Business through the SBA and Department of General Services. MBC is also certified as an MBE company through the CPUC Clearing House.  MBC serves many major commercial, industrial and residential developments as well as local, private, county, state and federal contracting agencies. MBC now performs a broad spectrum of project types (civil, utilities), always staying true to its company vision of Pride, Quality and Commitment to Excellence. 

The MBC team has worked hard to earn an impressive EMR safety rating and is sufficiently bonded.  MBC possesses the knowledge, experience and skill necessary to design and construct the best solutions while employing optimal construction methods. Our crews self-perform the vast majority of work under our contracts. This allows us to control the schedule and safety, which translates into significant cost savings and efficiency for the client.

What We Do

Commercial Experience

Athletic Field Bridge Dams & Levies Government Park / Playground Road / Highway Terminal - Airport / Bus / Railroad
Airport Runway Civil & Site Development Military Parking Lots Tennis Court Utilities

Regions & Counties Serviced

  • California-Central Valley-Sacramento, Fresno, Bakersfield

California 19

  • Amador
  • Butte
  • Calaveras
  • Colusa
  • Contra Costa
  • El Dorado
  • Mariposa
  • Napa
  • Nevada
  • Placer
  • Plumas
  • Sacramento
  • San Joaquin
  • Solano
  • Sonoma
  • Sutter
  • Tuolumne
  • Yolo
  • Yuba

Our CSI Codes

01 35 16 - Alteration Project Procedures
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 50 00.00.01 - Site Remediation
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
03 10 00.00.01 - Concrete Forming and Accessories
03 11 13 - Structural Cast-in-Place Concrete Forming
03 11 13.13 - Concrete Slip Forming
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 35 29 - Tooled Concrete Finishing
03 35 33 - Stamped Concrete Finishing
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 05 13 - Soils for Earthwork
31 05 16 - Aggregates for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 24 13 - Roadway Embankments
31 30 00.00.01 - Earthwork Methods
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 36 13 - Gabion Boxes
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 50 00.00.01 - Excavation Support and Protection
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 10 00.00.01 - Bases, Ballasts, and Paving
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 14 23 - Asphalt Unit Paving
32 14 29 - Recycled-Rubber Paving
32 15 40 - Crushed Stone Surfacing
32 16 13 - Concrete Curbs and Gutters
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 16 13.23 - Precast Concrete Curbs and Gutters
32 16 13.26 - Precast Concrete Curbs
32 16 13.29 - Precast Concrete Gutters
32 16 19 - Asphalt Curbs
32 16 40 - Stone Curbs
32 18 13 - Synthetic Grass Surfacing
32 18 16 - Synthetic Resilient Surfacing
32 18 23 - Athletic Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.23 - Field Sport Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 18 23.29 - Synthetic Field Sport Surfacing
32 18 23.33 - Running Track Surfacing
32 18 23.36 - Natural Running Track Surfacing
32 18 23.39 - Synthetic Running Track Surfacing
32 18 23.43 - Recreational Court Surfacing
32 18 23.53 - Tennis Court Surfacing
32 18 23.56 - Natural Tennis Court Surfacing
32 18 23.59 - Synthetic Tennis Court Surfacing
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 10 00.00.01 - Water Utilities
33 11 16 - Site Water Utility Distribution Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 40 00.00.01 - Storm Drainage Utilities
33 41 13 - Public Storm Utility Drainage Piping
33 42 13 - Pipe Culverts
33 42 13.13 - Public Pipe Culverts
33 42 16 - Concrete Culverts
33 42 16.13 - Precast Concrete Culverts
33 42 16.16 - Cast-in-Place Concrete Culverts
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 70 00.00.01 - Electrical Utilities
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs
  • Projects From $20,000 and above

Diversity

  • Minority Business Enterprise
  • Minority Business Concern
  • Small Business Enterprise
  • Local Business Enterprise

Gallery

Featured Image 1
Truckee River Bridge & Dollar Creek Trail
Featured Image 2
Camp Pendleton Sewer Repair
Featured Image 3
Mariposa Grove Restoration Phase 4
Featured Image 4
Travis Air Force Base Keel Repair
Service Area and Locations Map for Martin Brothers Construction

Associations & Memberships

CFMA (Construction Financial Management Assn.)
CFMA (Construction Financial Management Assn.)
EUCA (Engineering & Utility Contractors Assn.)
EUCA (Engineering & Utility Contractors Assn.)
Laborers Local 185
Laborers Local 185
NAPA (National Asphalt Pavement Assn.)
NAPA (National Asphalt Pavement Assn.)
Cement Masons Local #300
Cement Masons Local #300
Operating Engineers Local No. 3
Operating Engineers Local No. 3
Share URL copied!
https://www.thebluebook.com/iProView/1758136/martin-brothers-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.