People Also View These
Loading...
Our Story
Prestige Environmental was established in 2015. Our company specializes in demolition, mold removal, asbestos abatement, lead safe work, & sandblasting. We service all of New England except Connecticut & Vermont.
Commercial Experience
Regions & Counties Serviced
- New England
Massachusetts 1
- Essex
Our CSI Codes
01 94 13 - Facility Decommissioning Procedures
02 06 80 - Schedules for Facility Remediation
02 26 23 - Asbestos Assessment
02 26 33.13 - Mold Assessment
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 51 29.13 - High-Pressure Water Cleaning Decontamination
02 51 33 - Surface Removal Decontamination
02 51 33.13 - Surface Removal Decontamination by Grinding
02 51 33.16 - Surface Removal Decontamination by Sand Blasting
02 51 33.19 - Surface Removal Decontamination by Ultrasound
02 61 26 - Removal and Disposal of Asbestos Contaminated Soils
02 82 13 - Asbestos Abatement
02 82 13.13 - Glovebag Asbestos Abatement
02 82 13.16 - Precautions for Asbestos Abatement
02 82 13.19 - Asbestos Floor Tile and Mastic Abatement
02 82 16 - Engineering Control of Asbestos Containing Materials
02 82 33 - Removal and Disposal of Asbestos Containing Materials
02 85 13 - Precautions for Mold Remediation
02 85 16 - Mold Remediation Preparation and Containment
02 85 19 - Mold Remediation Clearance Air Sampling
02 85 33 - Removal and Disposal of Materials with Mold
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 30 00.00.01 - HVAC Air Distribution
41 36 23.16 - High-Pressure Water Cutting Equipment