Logo

IHC Construction

Share

Marietta, GA 30067

Company Info

  • Est. 1906
  • Size 250-499 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Beecher Wastewater Treatment Plant

Project Information

Project Location:
GA
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
Village of Beecher, Beecher, IL

Scope Of Work

Wastewater Treatment Plant Improvements

Construction consists of renovation of existing submersible raw sewage pumping station

Replacement of existing in-channel rotary basket screen including a new pre-fabricated fiberglass building

Renovation of the existing 3-ring oxidation ditch including the addition of two-disc aerators for the outer ring, four new drives for eight existing rotors in the middle and inner rings, VFDs, and controls

A new concrete secondary clarifier flow division box with three motor-actuated weir gates

Renovation of two existing secondary clarifiers including repair, replacement, and painting of components and re-coating of fiberglass dome

A new concrete secondary clarifier No. 3

A new concrete UV disinfection channel

A new masonry chemical feed building including chemical storage tank and chemical metering pumps, skid-mounted NPW system, and belt press feed pumps

Renovation of aerobic digester including new diffused aeration system

conversion of an existing garage to a sludge building including a new 3-belt press, polymer feed equipment, sludge conveyors, and all necessary piping, electrical work, control system modifications, and other miscellaneous items of work

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1553824/ihc-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.