Irish Commercial Construction

Lombard, Illinois 60148
View Phone


Our Story

Our main lines of business include: Acoustical Contractors, Air Conditioning Contractors, Mason Contractors, Building Alterations, Carpentry Contractors, Access Doors.

Irish Commercial Construction has been listed in the Blue Book since 2017.

What We Do

CSI Codes

Our standard scope of services includes the following CSI Master Format™ code(s).
01 35 16 - Alteration Project Procedures
04 01 20 - Maintenance of Unit Masonry
04 01 20.51 - Unit Masonry Maintenance
04 01 60 - Maintenance of Corrosion-Resistant Masonry
04 01 70 - Maintenance of Manufactured Masonry
04 05 16 - Masonry Grouting
04 06 20 - Schedules for Unit Masonry
04 06 20.13 - Masonry Unit Schedule
04 06 60 - Schedules for Corrosion-Resistant Masonry
04 57 00.00.01 - Masonry Fireplaces
06 01 10 - Maintenance of Rough Carpentry
06 01 10.71 - Rough Carpentry Rehabilitation
06 01 10.91 - Rough Carpentry Restoration
06 01 10.92 - Rough Carpentry Preservation
06 06 10 - Schedules for Rough Carpentry
06 06 10.13 - Nailing Schedule
06 06 10.19 - Plywood Shear Wall Schedule
06 10 53 - Miscellaneous Rough Carpentry
06 13 13 - Log Construction
06 13 13.91 - Period Horizontal Log Work
06 13 16 - Pole Construction
06 13 23 - Heavy Timber Construction
06 14 00.00.01 - Treated Wood Foundations
06 16 43 - Gypsum Sheathing
06 16 63 - Cementitious Sheathing
06 20 13 - Exterior Finish Carpentry
06 26 13 - Profile Board Paneling
06 46 91 - Splicing of Wooden Components
07 72 33 - Roof Hatches
07 72 36 - Smoke Vents
08 01 10 - Operation and Maintenance of Doors and Frames
08 01 30 - Operation and Maintenance of Specialty Doors and Frames
08 06 10 - Door Schedule
08 31 13 - Access Doors and Frames
08 31 13.53 - Security Access Doors and Frames
08 31 16 - Access Panels and Frames
08 39 13 - Airtight Doors
08 39 19 - Watertight Doors
08 42 29 - Automatic Entrances
09 01 20 - Maintenance of Plaster and Gypsum Board
09 01 80 - Maintenance of Acoustic Treatment
09 06 20 - Schedules for Plaster and Gypsum Board
09 06 50 - Schedules for Ceilings
09 06 80 - Schedules for Acoustical Treatment
09 20 00.00.01 - Plaster and Gypsum Board
09 21 16 - Gypsum Board Assemblies
09 21 16.23 - Gypsum Board Shaft Wall Assemblies
09 21 16.33 - Gypsum Board Area Separation Wall Assemblies
09 28 13 - Cementitious Backing Boards
09 28 16 - Glass-Mat Faced Gypsum Backing Boards
09 28 19 - Fibered Gypsum Backing Boards
09 51 53 - Direct-Applied Acoustical Ceilings
09 62 23 - Bamboo Flooring
09 64 19 - Wood Composition Flooring
09 64 23 - Wood Parquet Flooring
09 64 23.13 - Acrylic-Impregnated Wood Parquet Flooring
09 64 29 - Wood Strip and Plank Flooring
09 64 33 - Laminated Wood Flooring
09 64 53 - Resilient Wood Flooring Assemblies
09 94 13 - Textured Finishing
12 11 23 - Brick Murals
22 01 10 - Operation and Maintenance of Plumbing Piping and Pumps
22 01 30 - Operation and Maintenance of Plumbing Equipment
22 01 40 - Operation and Maintenance of Plumbing Fixtures
22 06 10 - Schedules for Plumbing Piping and Pumps
22 06 10.13 - Plumbing Pump Schedule
22 06 30.13 - Domestic Water Heater Schedule
22 10 00.00.01 - Plumbing Piping and Pumps
22 13 19.13 - Sanitary Drains
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 30 00.00.01 - HVAC Air Distribution
23 33 33 - Duct-Mounting Access Doors
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
35 41 16 - Levee Cutoff Trenches
35 49 13.16 - Masonry Floodwalls
40 95 73 - Process Control Wiring

Company Information

Labor Affiliation:
Not Provided Request
Annual Volume:
Not Provided Request
Company Size:
Not Provided Request
Service Sector:
Not Provided Request
Typical Project Size:
Not Provided Request
Project Types:
Not Provided Request

Go to next section: