Logo

Drainage Doctor, LLC

Dousman, WI 53118

Company Info

  • Est. 2007
  • Size 5-9 Employees
  • Annual Vol $500,000 - $1 million

People Also View These
Loading...

Our Story

Nathan Minor started the Drainage Doctor in 2007 with a sole focus on post construction BMP Maintenance.  Over 14 years of operation Drainage Doctor has grown into a Leader in Stormwater and Erosion Control services across Southern Wisconsin; providing construction site erosion control, commercial stormwater solutions and post construction BMP maintenance.  In 2017 Tyler Smith a Civil PE partnered with Drainage Doctor to provide a full scope of Civil Engineering services.  This partnership gives Drainage Doctor the unique ability to keep installation and maintenance in mind while designing cost efficient Civil Engineering plans.  This addition has also allowed Drainage Doctor to be a full service Design Build team, creating and implementing stormwater plans & repairs from start to finish.  

In 2021 we are excited to add DRONE assisted Topographical Surveys & 3D Modeling.  Utilizing new DRONE TECHNOLOGIES and state of the art software, we are able to provide topographical surveys with elevations of +-1cm.  Not only is this technology accurate, but it reduces time in the field and costs for our customers.  

Summary of Services:

Civil Engineering

Drone Surveying

Design Build

Construction Site Erosion Control & Reporting

Commercial BMP Maintenance

 

What We Do

Commercial Experience

Misc Project
Civil & Site Development Design Build Non-Building Construction

Regions & Counties Serviced

  • Wisconsin - Milwaukee, Madison, Green Bay

Wisconsin All

Our CSI Codes

01 32 23 - Survey and Layout Data
01 32 26 - Construction Progress Reporting
01 32 33 - Photographic Documentation
01 45 16 - Field Quality Control Procedures
01 45 23 - Testing and Inspecting Services
01 45 26 - Plant Inspection Procedures
01 50 00.00.01 - Temporary Facilities and Controls
01 57 13 - Temporary Erosion and Sediment Control
01 57 23 - Temporary Storm Water Pollution Control
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 78 29 - Final Site Survey
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 21 13 - Site Surveys
02 21 16 - Measured Drawings
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 30 00.00.01 - Subsurface Investigation
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
02 55 00.00.01 - Remediation Soil Stabilization
02 57 16 - Sinkhole Remediation by Backfilling
02 58 13 - Snow Fencing
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 11 00.00.01 - Clearing and Grubbing
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 19 - Dewatering
31 23 23 - Fill
31 23 23.13 - Backfill
31 23 33 - Trenching and Backfilling
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 33 43 - Vegetated Rock Slope Stabilization
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 36 13 - Gabion Boxes
31 36 19 - Gabion Mattresses
31 36 19.13 - Vegetated Gabion Mattresses
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
32 05 13 - Soils for Exterior Improvements
32 05 16 - Aggregates for Exterior Improvements
32 05 19 - Geosynthetics for Exterior Improvements
32 05 19.16 - Geomembranes for Exterior Improvements
32 05 23 - Cement and Concrete for Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
32 30 00.00.01 - Site Improvements
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 34 - Reinforced Soil Retaining Walls
32 32 36 - Gabion Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 90 00.00.01 - Planting
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 06 40.13 - Storm Drainage Schedule
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 40 00.00.01 - Storm Drainage Utilities
33 41 13 - Public Storm Utility Drainage Piping
33 42 13 - Pipe Culverts
33 42 13.13 - Public Pipe Culverts
33 42 16 - Concrete Culverts
33 42 16.13 - Precast Concrete Culverts
33 42 16.16 - Cast-in-Place Concrete Culverts
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 45 00.00.01 - Storm Utility Drainage Pumps
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 47 13 - Pond and Reservoir Liners
33 47 13.13 - Pond Liners
33 47 13.53 - Reservoir Liners
33 47 19 - Water Ponds and Reservoirs
33 47 19.16 - Water Retainage Reservoirs
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.16 - Retention Basins
33 49 13 - Storm Drainage Manholes, Frames, and Covers
33 49 23 - Storm Drainage Water Retention Structures
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
35 31 29.40 - Stone Groins
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
44 01 40 - Operation and Maintenance of Water Treatment Equipment
44 08 40 - Commissioning Water Treatment Equipment

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs

Gallery

Featured Image 1
Inlet Filters
Featured Image 2
Rain Gardens
Featured Image 3
Catch Basin Sumps
Featured Image 4
Detention Basin

Associations & Memberships

APWA (American Public Works Assn.)
APWA (American Public Works Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/1467687/drainage-doctor-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.