Re: Recent Projects at Heritage Environmental Services
Dear Mr. Barker;
I would like to say thank you for your help in several recent projects and repairs at our Indianapolis treatment facility. In the past few months you have worked with me to accomplish both large and small jobs including pump installation, hi pressure piping repair, scrubber ducting repair, concrete repair, and the design and installation of our new steam heating system in the CBR building.
Your prompt response, skilled craftsmanship, professionalism, and your willingness to tackle both large and small jobs has been a great asset in the maintenance and upkeep of our facility. These attributes build upon past work experiences at the facility and I look forward to continuing our mutually beneficial relationship.
Sincerely,
Heritage Environmental Services, LLC
Cory W. Allen; Plant Engineer
Scott,
I just wanted to let you know how great it was to have a contractor on site that was in charge of the whole project from start to finish.
The MM4 mixer project that John and his crew completed, recently, was very organized and he communicated with us at every junction he faced. We don’t always get that from others.
I look forward to working with you guys in the future and I will send anybody who asks if I know a good contractor, your way.
Please take some money out of petty cash and give John and his crew a raise.
Best regards,
Larry Polesel // Maintenance Group Leader
LORD Corporation
Indianapolis Operations
To whom it may concern,
I am writing this letter with the intent of expressing the confidence I have in Maddox Industrial Group, Inc. Maddox has provided Pinnacle with interactive project planning and project improvement ideas that have saved time and money while delivering superior craftsmanship and project completion; on time and of the highest quality. I have been working with Scott Barker and the Maddox team for several years now and they have proven their ability to perform consistently and professionally time after time. The on-site crews have always been highly skilled, safety conscious, and friendly. Two of the more recent projects that I have used Maddox for is a tank farm installation that included 13 oil storage tanks for which they installed all the process piping and fitted several tanks with heat exchangers that utilize steam as their heat source. This project included running steam piping all the way to our boiler several hundred feet away and modifying not only the connections for the new piping but an entirely new steam header. Maddox also provided me with a crew and equipment to install three new pieces of production equipment that had to be placed inside an area that was already surrounded by existing equipment. They did the equipment rigging and assisted my team with mechanical installation support. Maddox is currently working on a turn key piping installations project for Pinnacle that includes the fabrication of all of the pipe supports, as well as, all of the pipe installation for a 22 tank oil storage area that began about two weeks ago. Awarding work to Maddox Industrial Group, Inc. has become something that no longer takes any thought to do. We expect a great job to be done and have yet to be disappointed.
Sincerely, ????
Cliff Rohl; Maintenance Manager
Maddox Industrial Group (MIG) has work with Poet Cloverdale on numerous occasions over the past 4 years. Most recently, they installed 400 feet of 20” piping for an EPA regulated scrubber bypass project. The project was done on time and under our budget price. Maddox was very flexible in the scope of work, even when there were changes made to the routing of the pipe. I’ve used MIG for projects, shutdowns, and day to day maintenance needs.
Below is a list of some of the projects completed at our Biorefinery by MIG:
- ? 2 Concrete Pump Bases
- ? 10’ x 30’ Dryer Gas Train Enclosure
- ? Distillation Column Repairs
- ? Numerous Drag Conveyor Repairs
- ? Dryer Fan Bearing Replacement
- ? Grain Elevator belt/bucket/bearing Replacements
- ? Process piping repairs and projects
- ? Shutdown work: capable of supply 30+ men
- ? Installed 16,000 gallon Acetic Acid tank and piping
I highly recommend MIG for any pipe, mechanical, or concrete work.
Sincerely,
Brad McMahan; Maintenance Supervisor
To whom it may concern, I have been doing business with Maddox Industrial for more than 15 years and am very satisfied with the quality of their product and workmanship. This company has done several projects for Praxair, Inc. that have encompassed many different types of projects. To name a few, Oxygen (both cryogenic and gaseous), Nitrogen (both cryogenic and gaseous) and Argon.
A reference of projects that Maddox have acted as prime Contractor on are:
- Over lMM
Deer Park, Tx.-Liquid 02 Delivery System
This project included the strategic offloading and setting of various skidded and stand alone equipment. The interconnecting piping fabrication, cleaning, testing and installation were completed by Maddox, while the insulation and grouting were sub contracted and supervised by Maddox. - Vacuum Pressure Swing Absorbtion -Various projects across the USA.
Scott Barker has been the Prime Contractor on several of these projects that have required his team to travel far from their base of operations. Although Scott has bid against local Contractors, he has consistently out bid and still provided a quality product.
I highly recommend Scott Barker and Maddox Industrial Group to perform a wide range of projects and be highly satisfactory in their results.
Sincerly,
James F. Deal; E??gingering Consultant, Project Manager