GA-Column Partmark Presentation Tip
Written By: Advenser
Oct 12, 2018
Generally, column part marks will be in 45-degree alignment in default drawing creations. But sometime it would not help in Drawing presentation. To avoid this property, you can select advanced option and add value TRUE as shown below; It will improve drawing presentation, especially on conge
Read
Tekla (V2018)’s latest Changes in “Numbering settings”
Written By: Advenser
Oct 12, 2018
In Tekla Structures 2018 SP1, there is now a new advanced option XS_ENABLE_PHASE_OPTION_IN_NUMBERING that controls the Phase setting in the Numbering Setup dialog box. This advanced option is model specific and it is available in the Advanced Options dialog box. When XS_ENABLE_PHASE_OPTION_IN_NUM
Read
Use of “Display Detailing” in Tekla Modeling
Written By: Advenser
Oct 12, 2018
The most commonly used method to view all cut and fittings in an elevation/3d view is to utilize Delete and Undo commands together. The problem with this method is that it distorts the neatly arranged GA sheet presentation, which may well go unnoticed. So here’s a trick that gives you an alter
Read

Case Studies

200 Sydney St, Cambridge
Written By: Advenser
Oct 16, 2018
200 Sydney St, located in Fort Washington Research Center is a 4 story laboratory & office building. A major renovation work was planned in case of HVAC ducts.
Read
7001 Arlington Road
Written By: Advenser
Oct 16, 2018
7001 Arlington Road project was executed with a Turnaround time of over 5 months with the intensity of work performed depending necessarily on the stage of the project. A project-based pricing model was adopted based on the estimated hours involved for Advenser’s activities. Monthly invoices were ra
Read
CCU Science Building
Written By: Advenser
Oct 16, 2018
Advenser’s scope of work in the Science Building project was modeling and coordination of MEP services including HVAC and plumbing over the total.
Read
Ivy Quad Condominiums
Written By: Advenser
Oct 16, 2018
Ivy Quad townhouse complex is located in South Bend, US. This Luxury townhomes and flats were another milestone for Advenser. It took around 2 months to complete BIM modeling
Read
KOR Villas
Written By: Advenser
Oct 16, 2018
This resort villas situated in Hawaii for which the client had a requirement for the creation of BIM model with level of detailing LOD 300 for six floors approximately covering 1 Million sq. ft. including a main building
Read
LA Fitness Pompano
Written By: Advenser
Oct 16, 2018
LAF Pompano is a fitness club with 2 stories covering an area of 57000 sq.ft.The scope of work required Advenser to model steel elements (structural steel, precast panel connections and misc. steel) using Tekla
Read
New McDonough High School
Written By: Advenser
Oct 16, 2018
The high school project involved structures that comprised of heavy loped truss members, auditorium, catwalk structure, gymnasium, classrooms, parking garage and eight stair towers.
Read
Toyota Showroom
Written By: Advenser
Oct 16, 2018
The Honda-Toyota facility project in Seattle covering an area of 480,000 sq. feet required Advenser to model, coordinate and use this model for all other future showrooms.
Read
WEST O’ahu Station Group
Written By: Advenser
Oct 16, 2018
West O’ahu Station Group project contained a set of stations. Detailed scope included modeling of Architectural, Structural and..MEP services in LOD 300.
Read
Ft. Bliss Clinics
Written By: Advenser
Oct 11, 2018
Fort Bliss hospital is a $1 billion advanced medical facility replacing the current William Beaumont Army Medical Center (WBAMC). The scope of work for Advenser was to model and coordinate the clinical buildings which have a total area of 500,000 sq. feet. Advenser delivered MEP models using AutoCAD
Read
Google Kirkland Phase II
Written By: Advenser
Oct 11, 2018
In Google Kirkland campus, located in Washington, a new 2 story office building was proposed to suit existing office building over one level of structured parking. Phase II of the Google campus contains approximately 180,000 gross square feet of office space and 720 parking stalls in two underground
Read
LAF Pompano - Fitness Centre
Written By: Advenser
Oct 11, 2018
LAF Pompano is a fitness club with 2 stories covering an area of 57000 sq.ft. The scope of work required Advenser to model steel elements (main structural steel, precast panel connections and misc. steel) using Tekla Structures and to extract the drawings and reports to facilitate the construction o
Read
New McDonough High School
Written By: Advenser
Oct 11, 2018
The high school project involved structures that comprised of heavy sloped truss members, auditorium, catwalk structure, gymnasium, classrooms, parking garage and eight stair towers. The scope of work required Advenser to create 3D structural steel model including all main, embed and miscellaneous s
Read
Share URL copied!
https://www.thebluebook.com/iProView/1346247/advenser-llc/vendor-services/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.