Industrial Builders, Inc.

Share

Fargo, ND 58107

Home Contact Us

Company Info

  • Est. 1953
  • Size 100-249 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Warren and Irene Diederich founded Industrial Builders, Inc. together in 1953 with a passion for developing infrastructure in the Midwest and the dream of building a legacy that would serve their region for years to come. They had four children who all began careers with IBI in the 1970's. Paul and Donn, two of their sons, have lead the company as President and Executive Vice President, respectively, since 1992 and the third generation of Diederich family is involved in the company now. Warren and Irene started the company with as a family business where all employees were considered part of the family. IBI has grown substantially since Warren and Irene started it up but it's still a very tight knit community and we're proud of everyone that is a part of it.

When we started, our scope of skills was mostly limited to bridge work, but as Warren and Irene became involved with the Associated General Contractors (AGC), IBI began to change and enter new sectors. Paul and Donn have served as executives both at a state and national level in the AGC. Paul served as President of the National AGC in 2013 and Donn served as Chairman of the Highway Division in 2017. Consistent involvement in the AGC has allowed IBI to stay ahead of and influence trends in the construction industry. 

What We Do

Regions & Counties Serviced

  • North and South Dakota

Illinois All

Indiana All

Iowa All

Kansas All

Michigan All

Minnesota All

Missouri All

North Dakota 1

  • Cass

Ohio All

South Dakota All

Wisconsin All

Our CSI Codes

01 21 23 - Installation Allowances
01 35 16 - Alteration Project Procedures
01 53 26 - Temporary Runarounds
01 54 19 - Temporary Cranes
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 57 13 - Temporary Erosion and Sediment Control
01 73 16 - Erection
01 73 19 - Installation
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.13 - Paving Removal
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 57 16 - Sinkhole Remediation by Backfilling
02 58 13 - Snow Fencing
02 58 16 - Snow Avalanche Control
02 70 00.00.01 - Water Remediation
03 06 30.23 - Concrete Shaft Schedule
03 37 23 - Roller-Compacted Concrete
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
06 13 33 - Heavy Timber Pier Construction
31 01 60 - Maintenance of Special Foundations and Load Bearing Elements
31 01 62 - Maintenance of Driven Piles
31 01 62.61 - Driven Pile Repairs
31 01 63 - Maintenance of Bored and Augered Piles
31 01 63.61 - Bored and Augered Pile Repairs
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 06 20.13 - Trench Dimension Schedule
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 06 60.13 - Driven Pile Schedule
31 06 60.16 - Caisson Schedule
31 09 16.23 - Driven Pile Load Tests
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 22 16.13 - Roadway Subgrade Reshaping
31 23 13 - Subgrade Preparation
31 23 19 - Dewatering
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 30 00.00.01 - Earthwork Methods
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 32 36 - Soil Nailing
31 32 36.13 - Driven Soil Nailing
31 32 36.19 - Corrosion-Protected Soil Nailing
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 13 - Cantilever Needle Beams
31 48 19 - Bracket Piers
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 53 13 - Timber Cribwork
31 54 00.00.01 - Ground Freezing
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 62 13.13 - Cast-in-Place Concrete Piles
31 63 16 - Auger Cast Grout Piles
31 63 19.13 - Rock Sockets for Piles
31 63 23 - Bored Concrete Piles
31 63 23.13 - Bored and Belled Concrete Piles
31 63 23.16 - Bored Friction Concrete Piles
31 63 26 - Drilled Caissons
31 63 26.13 - Fixed End Caisson Piles
31 63 26.16 - Concrete Caissons for Marine Construction
31 63 29 - Drilled Concrete Piers and Shafts
31 63 29.13 - Uncased Drilled Concrete Piers
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
31 75 13 - Cast-in-Place Concrete Shaft Lining
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 01 11.51 - Rubber and Paint Removal from Paving
32 01 11.52 - Rubber Removal from Paving
32 01 16 - Flexible Paving Rehabilitation
32 01 16.71 - Cold Milling Asphalt Paving
32 01 16.72 - Asphalt Paving Reuse
32 01 16.73 - In Place Cold Reused Asphalt Paving
32 01 16.74 - In Place Hot Reused Asphalt Paving
32 01 16.75 - Heater Scarifying of Asphalt Paving
32 01 26.71 - Grooving of Concrete Paving
32 01 26.72 - Grinding of Concrete Paving
32 01 26.73 - Milling of Concrete Paving
32 01 26.75 - Concrete Paving Reuse
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 06 30.13 - Retaining Wall Schedule
32 14 29 - Recycled-Rubber Paving
32 30 00.00.01 - Site Improvements
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 06 50 - Schedules for Fuel Distribution Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 01 13 - Operation and Maintenance of Roadways
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 43 - Schedules for Bridges
34 82 19 - Bridge Pier Protection
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.16 - Segmental Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 31 29.40 - Stone Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
35 43 37 - Riprap Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 33 - Underwater Pipeline Construction
35 53 43 - Underwater Foundation Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 13 - Earth Embankment Dam
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
41 01 30 - Operation and Maintenance of Manufacturing Equipment
41 22 13 - Cranes
41 22 13.13 - Bridge Cranes
41 22 13.16 - Gantry Cranes
41 22 13.19 - Jib Cranes
41 22 13.23 - Mobile Cranes
41 22 13.26 - Tower Cranes
41 22 13.29 - Specialty Cranes
41 22 33 - Derricks
41 24 39 - Railcar Movers
43 01 10 - Operation and Maintenance of Gas Handling Equipment
43 01 20 - Operation and Maintenance of Liquid Handling Equipment
43 22 43 - Liquid Filters
43 22 43.13 - Cyclonic Liquid Filters
44 01 40 - Operation and Maintenance of Water Treatment Equipment
44 42 13 - Aeration Water Treatment Equipment
44 42 16 - American Petroleum Institute Separators
44 42 19 - Water Treatment Blowers
44 42 23 - Water Treatment Clarifiers
44 42 29 - Water Treatment Compressors
44 42 33 - Water Treatment Digesters
44 42 36 - Water Treatment Dissolved Air Flotation Equipment
44 42 39 - Water Treatment Grit Collectors
44 42 43 - Water Treatment Induced Air Flotation Equipment
44 42 46 - Water Treatment Mixers
44 42 49 - Water Treatment Oil/Grease Interceptors
44 42 53 - Water Treatment Oil/Water Separators
44 42 56 - Water Treatment Pumps
44 42 63 - Water Treatment Sediment Removal Equipment
44 42 66 - Water Treatment Skimmers
44 42 73 - Water Treatment Tanks/Tank Liners
44 43 13.13 - Bag Water Filters
44 43 13.16 - Cartridge Water Filters
44 43 13.19 - Fabric Water Filters
44 43 13.23 - Multimedia Water Filters
44 43 13.26 - Packaged Water Filters
44 43 23 - Water Filter Presses
44 43 26 - Rotary-Drum Water Filtration Equipment
44 43 33 - Water Filtration Screens
44 43 36 - Vacuum Water Filtration Equipment
44 44 16 - Water Chlorinators
44 44 26 - Dissolved-Solids Water Treatment Equipment
44 44 43 - Water Heavy Metals Treatment Equipment
44 44 59 - Water pH Adjustment Equipment
44 44 63 - Water Polymers Equipment
44 44 66 - Water Precipitators
44 44 73 - Water Ultraviolet Radiation Equipment
44 45 16 - Water Bubble Membrane Diffusers
44 46 13 - Sludge Conveyors

Project Experience

  • Service Work/Repairs

Gallery

Featured Image 1
Services
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services
Service Area and Locations Map for Industrial Builders, Inc.

Associations & Memberships

AGC of Minnesota
AGC of Minnesota
BROWZ
BROWZ
AGC (Associated General Contractors)
AGC (Associated General Contractors)
ISNetworld
ISNetworld
NCCCO (National Commission for the Certification of Crane Operators)
NCCCO (National Commission for the Certification of Crane Operators)
Lignite Energy Council
Lignite Energy Council
PEC Safety Authorized Provider
PEC Safety Authorized Provider
The Chamber of Fargo, Moorhead, West Fargo
The Chamber of Fargo, Moorhead, West Fargo

Preferred Brands

Cargill Surface Overlay
Cargill Surface Overlay
Share URL copied!
https://www.thebluebook.com/iProView/1125890/industrial-builders-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.