Featured Project Return to Projects List
Explosive Ordnance Exploitation Complex
Project Information
- Project Location:
- Redstone Arsenal, AL
- Status:
- Completed
- Structure Type:
- Storage Facility / Warehouse
References
- Owner:
- US Army
- Architect:
- US Army Corps of Engineers - Mobile District
- General Contractor:
- Southeast Cherokee
Scope Of Work
Plans and specs project consisting of furnishing and erecting three pre-engineered steel buildings and metal roof system. The pre-engineered steel buildings have 4" factory insulated roof panels and 3" factory insulated wall panels. The metal roof system will be installed over conventional steel framing with two layers of 2.5" rigid board insulation with water and ice shield.