Logo

BRW Construction Group LLC

Garden City, GA 31408

Company Info

  • Est. 2003
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Lady's Island Sewer Diversion - Division II Pump Station SS01

Project Information

Project Location:
Lady's Island, GA
Approx Contract:
$3,000,000
Status:
Completed - Jan 2019
Structure Type:
Sewage / Water Treatment Plant

References

Client:
Beaufort Jasper Water & Sewer Authority

Scope Of Work

This project consisted of constructing a new self-priming centrifugal pump station to replace an existing station slated for demolition.

The new cast-in-place wet well was placed on micro-piling and the new pump house was built watertight for flood protection including water-tight concrete walls with brick veneer, flood proof doors and all electrical raised above the 100 year flood elevation. Work within the small parcel of land owned by BJWSA was complex but the station was constructed with a keen eye for architecture due to surrounding homes and City planning requirements. The station is fully backed-up with electrical power generation and natural gas for pump operation in the event of a storm event.

The project was completed in 2019 and is one of the largest stations in BJWSA’s system.

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/959295/brw-construction-group-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.