Logo

The Sweet Group LLC

Share

New York, NY 10004

Company Info

  • Est. 1952
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

95 Evergreen

Project Information

Project Location:
Bushwick, NY
Status:
Completed
Structure Type:
Office Building

References

Architect:
Fogarty Finger
Client:
Savanna Fund

Scope Of Work

This job was an interior infrastructure renovation of the existing Schlitz Brewery. The building required a change from industrial to office space. The main exterior structure was compromised, which required all new structural correction at each floor and enlargement of existing window openings. The project required many additional new  and installations, including new 4,000 amp electric service, new con-ed vaults, new high pressure gas service, new domestic fire and water , a new elevators, new , high-efficiency windows, new RTU mechanical equipment, Solar + complete roofing assembly, an updated steam heating system, complete white box lighting, toilets and lobby, along with complete exterior site package. We worked with Savanna Fund on this project. The architect was Fogarty Finger and the MEP Engineer was MG Engineering.  

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/944891/the-sweet-group-llc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.