Dominion Power Chesterfield Station FFCP Facility

Project Information

Project Location:
Chester, VA
Status:
Completed - Mar 2017
Structure Type:
Renewable Energy

References

Owner:
Dominion Energy

Scope Of Work

Dominion Power Chesterfield Station FFCP Facility

Strack Inc. installed all the contact storm water drainage system, leachate Force Main and Sump Riser Collection Systems for the long-term Coal Combustion Residual Landfill.  All the pipe was fused HDPE and corrugated Storm collection pipe.
Oct 2015-May 2017

Dominion Power Chesterfield Station Low Volume Waste Water Treatment System Phase 1A

Strack, Inc. Installed 1500 LF of 36” HDPE Coal Pile Contact Storm Water Collection pipe as well as 3000 LF of 6” Leachate Force main.  500 LF of Perforated Underdrain, 2 Sump Riser Assemblies and 3 48” Jack and Bores Underneath Conondale Road.  780 LF of Fire Protection loop for the Plant’s Coal pile.
Oct 2016-May 2017.

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/939919/strack-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.