Texas Shot Blast, LLC
San Antonio, TX 78259
Featured Project Return to Projects List
Praise Cathedral
Project Information
- Project Location:
- TX
- Status:
- Completed
- Structure Type:
- Church / Synagogue
Scope Of Work
Patio Drainage Correction
Creating a slope with a shavemaster and diamond grinder
The exterior patio/covered entry was part of the building slab and was poured flat with a smooth troweled finish. Heavy rain and wind resulted in water puddling in entryway. We were hired to create a slope away from the building so water would drain properly. We utilized a shavemaster (machine with 50 sawblades). Each 1 foot pass shaves off approximately 1/8" of concrete. After each pass with the shavemaster we diamond grind to remove ridges and smooth out the concrete. After we completed the slope correction the area was coated by others.
Total Project Size: 1,289 square feet
Contractor requested a gradual slope of 1" over 18 feet
Slope was created using a shavemaster and diamond grinder
Project Duration: 3 days