Logo

Balfour Beatty Construction

Share

Nashville, TN 37214

Company Info

  • Est. 1909
  • Size 500+ Employees
  • Annual Vol > $50 million

Featured Project Return to Projects List

Memorial Regional Hospital NICU Addition

Project Information

Project Location:
Hollywood, FL
Approx Contract:
$20,000,000
Status:
Completed - Aug 2009
Structure Type:
Hospital / Nursing Home

References

Owner:
Memorial Healthcare System
Architect:
Gresham, Smith and Partners
General Contractor:
Balfour Beatty Construction
Client:
Joe Alcure - Director of Construction and Design Services
(954) 433-7184
Memorial Healthcare System

Scope Of Work

Construction Manager at Risk - Construction of a four-story, 50,300 square foot NICU addition attached to the east elevation of Memorial Regional Hospital. The work is to be completed in three phases:

Phase One:Shell space for future remodeling on the first floor, twenty (20) new NICU beds on the second floor, office space on the third floor, and a Mechanical penthouse on the fourth floor.

 

Unique challenges for the NICU project: Building a four-story structure adjacent to an active roadway with powerlines located within 30 feet of the jobsite. All work, material lifts and crane (erection, operation and dismantle) had to be taken into consideration while keeping the roadway active. Building a four-story structure that abutted to three (3) existing buildings one on each elevation except for the east elevation. This restricted the Balfour Beatty use of only the east elevation to construct the building and use as a lay-down area.

fi ce Building

Miramar, FL

Located on a 124-acre campus in Miramar, Florida, the 250,000

square foot Memorial Hospital Miramar is the

in the Memorial Healthcare System. The 128-bed full-service,

acute-care facility features Mediterranean-style architecture

with extensively landscaped grounds. The hospital offers private

patient rooms and a comprehensive array of medical and surgical

services.

70 acres of the campus are reserved for hospital, medical of

and future expansion projects, while roughly 54 acres is designated

wetlands with a 14-acre lake containing

connected by nature trails.

A 120,000 square

foot, four-story

medical of

building was built in

conjunction with the

new hospital and is

connected to it. The

MOB provides space

for approximately

100 physicians in 45

medical of

outpatient pharmacy

and a rehabilitation

center.

fi fth hospital fi ce, fi ve islands, fi ce fi ces, an

Contract delivery method:

CM at Risk

Final construction cost:

$88,778,000

Final project size:

370,000 square feet

Owner Reference:

System, David Schlemmer, Director of Construction

& Property, 954-276-5657 & Joseph

Alcure, Director of Construction and Design

Services, 954-433-7184

Memorial Healthcare

Architect Reference:

Partners, Ed Hengtgen, Division Vice President,

954-981-9100

Gresham Smith and

Length of business relationship with the

Owner:

16 years

Balfour Beatty Construction has provided preconstruction and construction manager at risk services for over 970 thousand square feet and over $231 million of facility improvements and new construction for Memorial Healthcare System.

Memorial Healthcare System - Miramar New Acute Care Hospital and Medical Of

Phase Two & Three: Interior remodeling of existing space and NICU to support the NICU program. Renovation was also included in the project.

Share URL copied!
https://www.thebluebook.com/iProView/822/balfour-beatty-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.