New Edison AZ
Phoenix, AZ 85024
Featured Project Return to Projects List
Dillon Precision
Project Information
- Project Location:
- Scottsdale, AZ
- Approx Contract:
- $149,000
- Status:
- Completed - Jun 2014
- Structure Type:
- Manufacturing Plant
References
- Owner:
- Steve Dillon
- Architect:
- none
- General Contractor:
- New Edison AZ
- Client:
-
Chris
Kersey
-
Leed Engineer
(480) 948-8009Dillon Precision
Scope Of Work
Dillon Precision had us change out all of there fluorescent lamps in their office, sales, production and storage areas with new 17 watt LED 4 ft Tube Lamps. In 90% of the areas we took a 4 lamp fixture and removed two fluorescent lamps ending up with two LED lamps that put out more light and half the energy cost that the 4 lamp fixture did. Then they had us replace 81 High Bay Warehouse fixtures with 28 inch LED panels. The difference was staggering! The loved the look of the LED light so much they then had us retro all new fixtures with LED Lamps in their Retail Showroom, again the difference was "oh my gosh" staggering. With the power, maintance savings and the one time federal tax credit Dillon will have an ROI under two years and after that it's all back to the bottom line!
We replaced all of the traditional lighting in Dillon Precision's warehouse with new, energy efficient LEDs. The project included offices, bathrooms, production areas, and break rooms.