Logo

American Inshore Divers Corporation

Liverpool, TX 77577

Company Info

  • Est. 2002
  • Size 10-19 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Johns Pass Bascule Bridge Replacement

Project Information

Project Location:
Madeira Beach, FL
Approx Contract:
$900,000
Status:
Completed
Structure Type:
Bridge

References

Owner:
FDOT
General Contractor:
Flatiron Constructors, Inc.

Scope Of Work

The depth of this project was 50'+ with limited working hours available. AIDC was able to come in and give the client 12 hrs of dive time every day using our Nitrox dive compressors. When faced with the removal and demolition of a 13' thick bascule foundation with hundreds of H piles embedded in the concrete with limited overhead space to work, AIDC was able to sketch out a large diameter core drill which was engineered by the customer and used to successfully extract the piles from the concrete.

Methods used on the project were: Nitrox Diving, Core Drilling, Vibratory Extraction, Burning, and Concrete Chipping, all performed under water.

This project was completed on time and under budget with zero accidents 

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/802475/american-inshore-divers-corporation/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.