People Also View These
Loading...
Our Story
R Hester Contractors Inc., also know as RHC, has been a strong presence in the Texas construction industry for over 35 yrs. President James A. Hester II has successfully continued the tradition of providing customers with quality services, outstanding time management and competitive bidding that James Hester Sr. envisioned when he founded the company in May of 1976.
Commercial Experience
Athletic Field
Club House / Community Center
Education (K-12)
Hotel / Motel
Industrial Maintenance
Misc Project
Office Building
Animal Hospital / Kennel
Apartments & Condominiums
Arena / Stadium
Assisted Living
Auto Dealership / Service
Bank
Church / Synagogue
City / Town Hall
Civil & Site Development
Court House
Data Centers - Mission Critical
Fire / Police Station
Fitness Center
Gas Station
Government
Grocery Stores
Hospital / Nursing Home
Jail / Prison
Laboratory
Library
Manufacturing Plant
Medical Office
Military
Mixed Use
Museum
Non-Building Construction
Non-Residential Building
Parking Garage
Parking Lots
Post Office
Pre-Manufactured Structures
Radio / Television Station
Residential Building
Restaurant
Retail Store
Road / Highway
School / College / University
Secure and Shielded Facilities
Sewage / Water Treatment Plant
Storage Facility / Warehouse
Tennis Court
Terminal - Airport / Bus / Railroad
Theater
Theme Park
Tract Housing
Regions & Counties Serviced
- San Antonio and Austin
Texas 4
- Bexar
- Comal
- Guadalupe
- Kendall
Our CSI Codes
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 41 13.13 - Paving Removal
02 58 16 - Snow Avalanche Control
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 30 00.00.01 - Earthwork Methods
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 72 13 - Rock Reinforcement and Initial Support
32 01 11.51 - Rubber and Paint Removal from Paving
32 01 11.52 - Rubber Removal from Paving
32 01 16 - Flexible Paving Rehabilitation
32 01 16.71 - Cold Milling Asphalt Paving
32 01 16.72 - Asphalt Paving Reuse
32 01 16.73 - In Place Cold Reused Asphalt Paving
32 01 16.74 - In Place Hot Reused Asphalt Paving
32 01 16.75 - Heater Scarifying of Asphalt Paving
32 01 26.71 - Grooving of Concrete Paving
32 01 26.72 - Grinding of Concrete Paving
32 01 26.73 - Milling of Concrete Paving
32 01 26.75 - Concrete Paving Reuse
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 11 33 - Cement-Treated Base Courses
32 14 29 - Recycled-Rubber Paving
32 30 00.00.01 - Site Improvements
32 32 34 - Reinforced Soil Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 41 16 - Levee Cutoff Trenches
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection
35 73 13 - Earth Embankment Dam
41 66 19 - Mobile Paving Equipment