Marine Technologies, Inc.

Baltimore, MD 21226

Company Info

  • Est. 1992
  • Size 50-99 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Joint Base Andrews Fuel Pier and Loading Platform Relocation

Project Information

Project Location:
Washington, DC
Approx Contract:
$2,000,000
Status:
Completed - Jul 2018
Structure Type:
Marine

References

Owner:
NuStar Energy, LP
Architect:
Not Provided
General Contractor:
Marine Technologies, Inc.

Scope Of Work

Project consisted of relocating the dock manifold downstream a distance that is equal to the distance that the downstream edge of the bridge is shifting. The scope of relocation work includes, but is not limited to: the supply and installation of thirteen 12" diameter steel pipe piles plumb;supply and installation of three 12" diameter steel pipe piles battered; supply and installation of eight 14" diameter steel pie piles battered; dynamic pile testing and restrike; construction of two each upstream and downstream mooring dolphins, supply and installation of two each steel framing and installation of owner supplied mooring bollard; installation of two each owner supplied fender systems; installation of piping from the manifold location to shore; and installation of lights on the walkway. 

An MTI marine survey crew will perform the pre-construction side scan sonar, and when construction is completed and prior to demobilization a post-construction scan will be performed to document any changes or debris.  MTI will remove all underwater debris deemed by the owner to pose a threat to navigation.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/795625/marine-technologies-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.