Logo

Marine Technologies, Inc.

Baltimore, MD 21226

Company Info

  • Est. 1992
  • Size 50-99 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Deck Upgrades Berths 11-12 Dundalk Marine Terminal

Project Information

Project Location:
Baltimore, MD
Approx Contract:
$8,000,000
Status:
Completed - Jul 2018
Structure Type:
Marine

References

Owner:
Maryland Port Administration
General Contractor:
Marine Technologies, Inc.

Scope Of Work

Project consisted of, but not limited to, the following upgrades performed in four phases:  Demolish and dispose at Chesapeake Bay reef replenishment program the existing concrete deck slab, precast concrete deck beams and railroad tracks in their entirety within the limits of 480 LF/20,000 SF as denoted on the contract drawings.  Perform concrete repairs 2,000 CF at the existing Crane Beam, Cap Beams and Facia Walls by chipping out and removing all loose unsound concrete; Replace corroded rebar as needed and then form and pump special corrosion inhibitor concrete to complete repairs. Install fiberglass jacket encasements including zinc anode CP system around thirty existing piles totaling 450 VF.  Install new plumb or battered 24" square prestressed concrete piles 154 ea with an average length of 95 LF and weighing 57,000 lbs each.  Install 36 ea new precast concrete pile caps, 175 ea new precast concrete slabs and place 950 CY new reeinforced concrete topping slab.  Install 2 ea 125 ton concrete bollards consisting of 8 ea new 16" square prestressed piles average length 95 LF, 56 CY of bollard foundation concrete, safety grating, plastic safety backing beams and tie-off hooks.  Project was completed safely, on time and within budget July 2018.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/795625/marine-technologies-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.