Advanced Constructors Corp.
Huntington Beach, CA 92649
People Also View These
Loading...
Our Story
Advanced Constructors, Corp. is a full service general engineering contractor specializing in the installation of manufacturing equipment and manufacturing facilities. We have 30 years experience in the installation of industrial manufacturing equipment and manufacturing facilities.
Our Services:
Millwright Services
- Installation and Maintenance
- Conveying Equipment
- Packaging Equipment
- Production Equipment
- Precision Alignment of Equipment
- Rigging and Relocation
Mechanical Services
- Installation and Maintenance of Cookers, Tanks, Exchangers, Filter Press, Vaporizers and Cooling Towers
- Sanitary Piping Systems Schedule 5 Stainless Steel for the Food and Beverage industries
- Stainless Steel Piping Systems schedule 10 thru 80 for process systems and equipment
- Carbon Steel Piping Systems schedule 10 thru 80 for process systems and equipment
- CPVC and PVC Piping Systems schedule 40 and 80 for process systems and equipment
Building Services
- Complete Building Design and Construction
- Installation of Concrete Foundations
- Installation of Masonry and Abrasive Tile
- Fabrication and Installation of Structural Steel
- Fabrication and Installation of Sheet Metal
- Demolition of Equipment and Buildings
- Furnace Refractory Hot Repairs
- 24 Hour Emergency Service
Commercial Experience
Non-Building Construction
Gas Station
Industrial Maintenance
Manufacturing Plant
Misc Project
Non-Residential Building
Power Generation & Distribution
Renewable Energy
Storage Facility / Warehouse
Utilities
Regions & Counties Serviced
- Orange, Riverside and San Bernardino Counties
California 5
- Los Angeles
- Orange
- Riverside
- San Bernardino
- Ventura
Our CSI Codes
01 93 13 - Facility Maintenance Procedures
02 01 80 - Maintenance of Facility Remediation
41 01 40 - Operation and Maintenance of Container Processing and Packaging
41 01 60 - Operation and Maintenance of Mobile Plant Equipment
41 06 40 - Schedules for Container Processing and Packaging
41 06 50 - Schedules for Material Storage
41 06 60 - Schedules for Mobile Plant Equipment
41 08 10 - Commissioning of Bulk Material Processing Equipment
41 08 20 - Commissioning of Piece Material Handling Equipment
41 08 40 - Commissioning of Container Processing and Packaging
41 08 50 - Commissioning of Material Storage
41 08 60 - Commissioning of Mobile Plant Equipment
43 01 30 - Operation and Maintenance of Gas and Liquid Hi-Purification Equipment