Featured Project Return to Projects List
Well #7 Water System Improvements Project
Project Information
- Project Location:
- Dillsburg, PA
- Approx Contract:
- $300,000
- Status:
- Completed - Feb 2010
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- Dillsburg Area Authority
- Architect:
- CET Engineering
- General Contractor:
- Bertolet Construction Corporation
- Client:
-
Jeremy
Hamsher
-
Professional Engineer
(717) 541-0622CET Engineering
Scope Of Work
Excavate for footers, piping, slab. Install concrete footers, split-faced block walls, concrete slab, roof trusses, etc. for addition to existing pump station. Install ductile iron, pvc piping, submersible Goulds pump, pitless adaptor, variable speed pump controller, pressure transmitter, chlorine residual analyzer, chart recorder, flow meters, valves, exhaust fan, etc.