Project Information
- Project Location:
- Ephrata, PA
- Approx Contract:
- $72,231
- Status:
- Completed - Sep 2012
- Structure Type:
- City / Town Hall
References
- Owner:
- Ephrata Borough
- Architect:
- Ephrata Borough
- General Contractor:
- Bertolet Construction Corporation
- Client:
-
Dave
Burkholder
-
Engineering Manager
(717) 738-9202Ephrata Borough
Scope Of Work
We did not start on this project but scope of work is excavate to install site lighting, concrete ADA ramps, sidewalks and paving. Install new street lights, ADA ramps, sidewalks, paving, line striping, wood guiderail and landscaping. The attached pictures of the existing site.