Featured Project Return to Projects List
NCH Microbiology Lab
Project Information
- Project Location:
- Naples, FL
- Approx Contract:
- $20,459
- Status:
- Completed - Aug 2010
- Structure Type:
- Hospital / Nursing Home
References
- Owner:
- Naples Community Hospital
- Architect:
- Bert Hill/pollock Kreig Architects, Inc.
- General Contractor:
- Gates Butz Institutional
- Client:
-
George
Carpentar
-
Project Manager
(239) 593-3777Gates Butz Institutional
Scope Of Work
Furnish and Install all labor, tools, equipment, supplies and material to complete all Mechanical, Heating, Ventilation and Air Conditioning work to include but not limited to the following: exhaust fans, dissonccect, cut, cap and remove all HVAC ductwork and or active HVAC accessories which include reheat boxes and thermostats, all ductwork accessories, fittings, turning vanes, dampers, smoke and fire dampers, ductwork sealants, HVAC duct hangers, maintain temporary filters in the AH's, ductwork and piping insultion, fire stopping for all through wall and or through flooring penetrations, reheat boxes, all associated piping, valves and controls, all differential presurization monitor and alarm, all grilles and diffusers, perform testing of installed HVAC system, install all thermostats including pneumatic and or electrical raceways wiring.