![Logo](https://pvu.thebluebook.com/inc/img/qp/8/anf-group-inc-logo.jpg?quality=90&width=120&height=120&mode=pad)
Featured Project Return to Projects List
2nd Cath Lab Hybrid OR - 1 Renovation
Project Information
- Project Location:
- Miami, FL
- Approx Contract:
- $350,000
- Status:
- Completed - May 2012
- Structure Type:
- Hospital / Nursing Home
References
- Owner:
- Miami Children’s Hospital
- Architect:
- HKS Architects, Inc.
- General Contractor:
- ANF Group, Inc.
- Client:
-
Silvia
Perez
(305) 669-7228Miami Children’s Hospital
Scope Of Work
This is the renovation of an existing OR to convert the room to a new, Hybrid OR. The scope of work included loading the materials through from a low roof, removal of the existing Owner equipment, adding new unistrut that is unique to the hybrid OR application, new lead lined drywall, new finishes and retrofitting the MEP systems in a very limited congested ceiling area.