Purple Line Extension, Section 2
Project Information
- Project Location:
- Los Angeles, NV
- Status:
- Completed
- Structure Type:
- Utilities
References
- Owner:
- Los Angeles County Metropolitan Transportation Authority
- Architect:
- STV Incorporated
Scope Of Work
From the current terminus at Wilshire/Western, the Purple Line Extension will extend westward for about 9 miles with seven new stations. It will provide a high-capacity, high-speed, dependable alternative for those traveling to and from LA’s “second downtown.” Section 2 of the three sections will deliver 2.55 miles of twin-bored tunnels and two new stations at Wilshire/Rodeo and Century City Constellation.
In January 2017, phase two of the project, which will extend trackage 2.6 miles (4.2 km) further to Century City, was awarded a $1.6 billion grant from the Federal Transit Administration, covering the majority of the $2.6 billion estimated cost of the project. On January 27, the Metro board awarded a $1.37 billion construction contract to a joint venture between Tutor Perini Corporation and O&G Industries, with construction scheduled to be completed by 2025.