Logo

Tutor Perini Corp.

New Rochelle, NY 10801

Company Info

  • Est. 1894
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

East Side Access CM007 Grand Central Terminal Caverns

Project Information

Project Location:
New York, NY
Status:
Completed
Structure Type:
Terminal - Airport / Bus / Railroad

References

Owner:
NYC Metropolitan Transportation Authority
Architect:
GEC (PB/STV/Parsons)

Scope Of Work

Construction of the Grand Central Terminal Station Caverns and installation of the track and special track work in the tunnels and GCT Caverns. The Cavern work includes fabrication and construction of the permanent structural concrete lining, interior structures, and fit-out of the cavern spaces. The contract also includes installation of all track, special track work and third rail from south of the south end of the stations, through the GCT Caverns, and through the tunnel portals in Queens. The contract work in Queens Bellmouth includes closure and backfill of the existing open tunnel structures and backfill of the structures and the site.

The scope of work includes structural precast fit-out of two 1000-foot existing caverns with 830 precast beams, 844 precast panels, 694 precast walls, and 370 precast platforms.

Track work consists of 52,000 track feet of RTB Tieblock construction, 14,000 track feet of Direct Fixation construction, 64,000 linear feet of Contact Rail installation, 32 turnouts, 52 switches, double cross-over Construction, 35,000 cubic yards consisting of track bed concrete, traction Power, and signal conduit installation.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/360504/tutor-perini-corp/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.