Logo

C.R. Meyer

Share

Muskegon, MI 49444

Company Info

  • Est. 1888
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Turbine/ Generator Project

Project Information

Project Location:
Counce, TN
Status:
Completed
Structure Type:
Industrial Maintenance

Scope Of Work

The Turbine/Generator project required CR Meyer to demolish the existing Salt Cake Towers followed by the construction of the EPC Buildings, Cooling Tower Foundation, Pipe Bridge & Foundation, Piping, and the Electrical Instrumentation. CR Meyer installed Steam, Condensate, Air, Mill Water, Cooling Water Piping, Turbine/Generator on Foundations, Condenser Hot Well Pumps, the Lube Oil Pump System, and Coolers. The final phase included the installation of the Cooling Tower Circulation Pumps as well as the assembly and attachment of the Condenser Turbine Generator Set.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/356457/c-r-meyer/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.