Logo

C.R. Meyer

Share

Muskegon, MI 49444

Company Info

  • Est. 1888
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Spill Tube Steel Liner Install

Project Information

Project Location:
Newaygo, MI
Status:
Completed
Structure Type:
Industrial Maintenance

Scope Of Work

Due to age, the existing steel was compromised and there was potential of failure if deterioration continued. CR Meyer was tasked with the demolition and replacement of approximately 1,850 square feet of steel in three spill tubes. Each tube required 1,265 1” holes be drilled ten inches deep for anchor installation.

The project required a dewatering plan; a scan for rebar interference and anchor bolt holes; a 3D scan to allow for specialized fabrication of new steel panels; assembly and mobilization of barges; construction of a cofferdam; demolition of existing 80 year old liner; and hand packed special grout in spalled areas.

Challenges were the ever present water leaking by existing equipment and weather. Changing weather conditions were continuously monitored to ensure they didn’t cause a ‘high water’ event which would require evacuation. To alleviate the situation, CR Meyer utilized extra dewatering equipment.

Share URL copied!
https://www.thebluebook.com/iProView/356457/c-r-meyer/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.