Hubert H. Humphrey Terminal - Orange Ramp

Project Information

Project Location:
Bloomington, MN
Approx Contract:
$63
Status:
Completed
Structure Type:
Terminal - Airport / Bus / Railroad

References

Owner:
Metropolitan Airports Commision
Architect:
Miller Dunwiddie Architects, Inc.
General Contractor:
Adolfson & Peterson

Scope Of Work

The Humphrey Terminal parking ramp is the largest single-building parking structure in the region. Located between the existing ramp and the light rail station, the new eight-story facility added 4,700 vehicle spaces, including 2,150 spaces for employee parking. The facility also includes a 12-story elevator core building, sophisticated mechanical and electrical system, climate-controlled skyways and a state-of-the-art CCTV security system. The ramp was originally designed as an eight-level facility, but midway through construction the client decided to prepare the structure to add two more levels in the future. A&P’s challenge was to find a cost-efficient way to strengthen the columns to support ten levels.  The entire project team helped come up with an innovative solution in which self-consolidating concrete was wrapped around more than 100 columns to solve the capacity challenge.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/34268/adolfson-peterson-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.