Logo

Fort Myer Construction Corp.

Washington, DC 20018-1594

Company Info

  • Est. 1972
  • Size 500+ Employees
  • Annual Vol > $50 million

Featured Project Return to Projects List

St. Elizabeth Temporary Parking Lot

Project Information

Project Location:
Southeast, DC
Approx Contract:
$20,000,000
Status:
Completed
Structure Type:
Parking Lots

References

Owner:
DC Department of General Services

Scope Of Work

This Design-Build project is to construct 3 temporary surface parking lots on St. Elizabeths East Campus. These parking lots will be located at the Dorothea Dix Administration Building, R.I.S.E Demonstration Center and Parcel 15 located at 2730 Martin Luther King, Jr. Ave in Southeast, DC. The temporary parking lots will include 876 parking spaces with ADA and valet parking. This project is in response to the ongoing redevelopment of the East Campus, including the need for additional temporary parking for the Gateway Pavilion, and the Entertainment & Sports Arena (ESA) facility.
 
Fort Myer worked with KCI Technologies in the design and development of the temporary parking lots. The work includes the demolition of selected sections of the site, including tree removal, utility demolition, drainage facilities, lighting, and constructing of 3 new parking lot.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/3285/fort-myer-construction-corp/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.