Citywide Pavement Restoration

Project Information

Project Location:
Washington, DC
Status:
Completed
Structure Type:
Road / Highway

References

Client:
District Department of Transportation ?

Scope Of Work

DDOT awarded Fort Myer Construction Corporation this contract to make various repairs to existing pavement structures such as pavement base, curbs, gutters, sidewalks, driveway entrances. This contract also includes constructing wheelchair and bicycle ramps to meet regulations established by the Americans With Disabilities Act (ADA). In various areas around DC, Fort Myer is dispatched to resurface roadway sections, make preliminary repairs to existing structures, manage utility cuts, reset stone curb, replace existing curb, furnish sewer-water manhole frames and basin tops, construct ADA ramps, and perform grading and excavating.

?In areas of AC surfaces, work consists of milling to a depth of I" to 2"; cleaning and routing of deteriorated pavement joints, potholes, tar patches, striping, and filling with asphalt materials; adjusting any necessary manholes and boxes to grade; applying tack coat; and laying AC surface course.  An indefinite quantity of projects are possible under this contract, based on orders issued (maximum $20M; minimum $I00K) during the term for each period. 67,277 tons of asphalt have been installed to-date under this contract.

?

Share URL copied!
https://www.thebluebook.com/iProView/3285/fort-myer-construction-corp/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.