Fort Myer Construction Corp.

Washington, DC 20018-1594

Company Info

  • Est. 1972
  • Size 500+ Employees
  • Annual Vol > $50 million

Featured Project Return to Projects List

31st Street Bridge Replacement

Project Information

Project Location:
Washington, DC
Status:
Completed
Structure Type:
Road / Highway

References

Client:
District Department of Transportation ?

Scope Of Work

The 31st Street Bridge Replacement project restored an existing two span bridge with a single span steel multi-girder superstructure with a new bridge constructed behind the existing canal walls. The existing pier was removed, salvaged, rehabilitated, and reset in its original location, but will no longer support the bridge and will have new ADA compliant sidewalks and ramps. Fort Myer was responsible for the installation of a temporary pedestrian bridge prior to the start of the bridge construction to maintain pedestrian access across the C&O Canal at all times.

The project also includes installation of temporary structures to laterally support the existing canal walls. Our team installing temporary utility supports, with protection of existing utilities, and coordination with all utility companies for relocation prior to bridge replacement. The removal, restoration, and re-installation of the historic pier and construction of a new bridge and railing, with ADA-compliant sidewalks and ramps.

?

Share URL copied!
https://www.thebluebook.com/iProView/3285/fort-myer-construction-corp/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.