Graybar Electric

Project Information

Project Location:
DePere, WI
Approx Contract:
$3,000,000
Status:
Completed
Structure Type:
Storage Facility / Warehouse

References

Owner:
GrayBar Electric DePere, WI

Scope Of Work

This project is a 59,500 square feet office and distribution center for a Fortune 500 distributor of high-quality components, equipment, and materials for the electrical and telecommunications industries.

The building was constructed using tilt-up concrete wall panels, which were cast on site, avoiding unnecessary transportation costs and fuel for delivery. Tilt-up concrete is a two-step process. First, slabs of concrete, which most often comprise load-bearing sections of a building envelope or elevation, were cast horizontally on a concrete slab-on-ground. After the concrete wall panels reached sufficient cure strength, they were then lifted (tilted) with a crane to form the facility walls.

The design and construction of this $3,200,000 project was completed in 7 months.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/290280/immel-construction-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.