Planet Fitness
Project Information
- Project Location:
- Peckville, PA
- Approx Contract:
- $1,000,000
- Status:
- Completed - Dec 2019
- Structure Type:
- Fitness Center
References
- General Contractor:
- Tricon Construction
Scope Of Work
Open Phase Remodel Scope of Work:
- Demolition - Select Demolition, Demolition existing front locker room wall,
- Concrete Saw Cutting - for plumbing and electrical work, Cut remove, and put back when Electrical and Plumbing are complete.
- Masonry EIFS - Facade and Stucco work
- Structural Steel - Structure work on the facade, and maybe around the RTU openings
- Roofing - Patch around Plumbing, Gas, and exhaust fan penetrations.
- Storefront - New exterior Store front doors
- Acoustical - Supply and Install New ACT Tile and Grid throughout space, Per plan
- Framing & Drywall- Supply and install Metal Framing and Sheetrock, Spackle ready for Paint. (Add Alt to include Demising wall)
- Ceramic Tile-Install Owner Supplied tile. Sub to supply Thin Set, Grout, Water proofing, Schluter outside corners.
- Rubber Flooring-Install Owner supplied Materials
- Vinyl Base-Supply and install Vinyl Cove Base throughout space.
- Floor Patch-Skim Coat entire floor ready for Rubber Floor install.
- Painting-Paint Ceilings (Dry fall), walls, doors, and frames as per plans.
- Sprinkler-Contractor is to supply and install code compliant system as per plans. Contractor is responsible for Permit & Permit cost (will be reimbursed), Inspections. Existing heads will need to be relocated
- Plumbing-Install Owner Supplied Light fixtures, Contractor is responsible for, all rough plumbing work and materials, all gas piping as per plans. Contractor is responsible for Permit & Permit cost (will be reimbursed), Inspections. Underground excavation.
- HVAC- Supply and install new Ductwork, Install new RTU's Supply and install ductwork, flext duct, grilles, registers & bathroom exhaust fans. Contractor is responsible for Permit & Permit cost &Inspections. Additional Line item for Supply RTU's
- Electric - Supply and install Power as Per plans. Install Owner Supplied Light fixtures, Contractor is responsible for Permit & Permit cost & Inspections.
- Fire Alarm - Supply and install new fire alarm system as per plans. Contractor is responsible for Engineering, Permit cost & Inspections. A few horns and strobes will have to be relocated.