Logo

California Boiler

Santa Ana, CA 92705

Company Info

  • Est. 1980
  • Size 100-249 Employees

Featured Project Return to Projects List

Marin French Cheese

Project Information

Project Location:
NC
Status:
Completed
Structure Type:
Restaurant

Scope Of Work

Industry: Producer of European style cheeses

Locations: Northern California

Solution: Boiler System Install

Background And Requirements 

Marin French Cheese has operated in the same location for over 150 years, and is the longest continually operating cheese company in America.  All their cheese products are handcrafted with passion, created with pride and made of the highest quality milk for a distinctive, authentic taste true to their heritage.

The plant’s  boiler facility needed to be replaced as their aging boiler was not capable of meeting capacity requirements and was operating on #2 fuel oil.

Analysis And Proposed Solution

The boiler system was built into a movable CONEX container with the following components:

Power Flame NP2 ultra-low Nox burner able to meet sub 9 ppm Nox

Dual stage economizer

Pre-heated Stainless Steel feedwater tank

Siemens LMV3 parallel position control 

Blow down separator

Three phase power convertor to breaker panel to supply lighting and control power 

Share URL copied!
https://www.thebluebook.com/iProView/260232/california-boiler/material-suppliers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.