San Antonio Public Safety Headquarters

Project Information

Project Location:
San Antonio, TX
Approx Contract:
$56,192,616
Status:
Completed - Nov 2012
Structure Type:
Fire / Police Station
LEED Certification (target):
Silver

References

Owner:
City of San Antonio
Architect:
Lopez Salas Architects/Fentress
General Contractor:
Hensel Phelps

Scope Of Work

The Mission Critical six-story, 243,797 square foot blast-resistant Headquarters centralizes and improves life safety services by integrating new data and security system technologies and providing much-needed space for 386 police staff and 96 fire department staff. Built of cast-in-place concrete, the 6-story office building features a glass atrium on the top three floors.  A steel and glass lobby connects the first two floors with the adjacent parking garage, which includes built-out office space and infrastructure for a future solar array. The project includes a separate 266,040 9-story parking garage with 662 parking spaces. 

The facility includes a 9-story parking garage connected on two levels, and adjacent fueling station with car wash.  The project entailed a complex design-build delivery method. Both buildings are mild-steel reinforced, cast-in-place concrete structures on drilled reinforced concrete piers and grade- beam foundations. The office tower uses pre-cast concrete panels anchored within the structural frame to provide additional building hardening (blast resistance technology) for the building façade. Construction involved a fast-tracked, phased permit process consisting of five permit packages: Sub-grade and utilities, foundations, core and shell, interior fit-out, site and landscape.  

The project was recognized as Best Municipal Project award by the San Antonio Business Journal in 2012, and received a National Design Build Award for Civic Buildings from the Design Build Institute of America in 2013.

 

 

The phased permitting allowed for sequenced bid and buy-out to better coordinate long-lead time components with a short construction schedule. Though the buildings were permitted under five separate packages, construction was scheduled and sequenced as a unified, single project. The result was delivery of the 6-story office building with attached 662-car parking garage delivered within the 16-month construction schedule, on time and on budget. 

 

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/251689/lopez-salas-architects-inc/architects/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.