Broadway Electric, Inc.
Elk Grove Village, IL 60007
Featured Project Return to Projects List
Lincoln Park High School Renovation
Project Information
- Project Location:
- Chicago, IL
- Approx Contract:
- $1,000,000
- Status:
- Completed - Jun 2013
- Structure Type:
- School / College / University
References
- Client:
- Chicago Public Schools (CPS)
Scope Of Work
After selective demolition was completed to provide access for the project, the overhaul of this century-old high school began. New system equipment included the following:
Distribution and branch panelboards
Disconnect switches and motor starters
Fire pump motor
150KW diesel generator and associated transfer switches
Bus detail and fuses for existing switchboards
Lighting fixtures and lamps
Lighting controls
Magnetic door holders and tie into fire alarm system
Voice & data cabling system
Fire alarm system
Aiphone door entry system
Assisted listening system
As part of this extensive renovation, several items that were in good working condition were relocated, including the existing panelboards and conduits that interfered with new walls and elevator shafts. Five branch circuit conduits per floor, used for each of the newly installed elevators, were also relocated.
?All power and final connections were provided to all of the new equipment provided under separate contracts, as well, including two elevators, the handicap lift, the door operators, all electric flush valves, the restroom hand dryers, a ceramics kiln in the art department, and all of the new mechanical equipment. The team performed all of the coring and firestopping as required for electrical work.