Commercial Flat Coating

Project Information

Project Location:
Chicago, IL
Status:
Completed - Aug 2022
Structure Type:
Retail Store
Products Used:
Employment Agencies:
Roofing Contractors
Flat Roofing
Skilled Roofing Labor
All Roofing Types
Roofing Contractors:
Roofing Contractors
Skilled Roofing Labor
Roof Tile
Skilled And Trained Workforce
All Roofing Types
Services Rendered:
Employment Agencies:
Roofing Contractors
Flat Roofing
Skilled Roofing Labor
Skilled And Trained Workforce
All Roofing Types
Gutters & Downspouts:
Roofing Contractors
Flat Roofing
Skilled Roofing Labor
Skilled And Trained Workforce
All Roofing Types
Roofing Contractors:
Roofing Contractors
Flat Roofing
Skilled Roofing Labor
Skilled And Trained Workforce
All Roofing Types

Scope Of Work

For this commercial flat coating we cleaned the roof, prepared it, painted all borders and around the air conditioner for  the application. Here is how the process was done:

  • Cleaned the roof: We cleaned the roof thoroughly before applying the coating. We used a pressure washer to remove any debris, dust, or dirt.
  • Inspected the roof: We checked the roof for any damage or defects. We repaired any leaks or damage before applying the coating.
  • Allowed the roof to dry: After cleaning the roof, we allowed it to dry completely before applying the coating. The drying time depended on the weather conditions.
  • Applied primer: We applied a primer to the roof surface as recommended by the coating manufacturer. The primer helped the coating adhere to the roof and improve its performance.
  • Applied the coating: We used a roller  to apply the coating evenly to the roof. We followed the manufacturer's instructions for the correct application thickness and drying time.
  • Allowed the coating to dry: The coating needed to dry for several hours or days, depending on the type of coating and weather conditions. We avoided walking on the roof during this time.
  • Applied a second coat (optional): Some coatings required a second coat. We waited until the first coat was completely dry before applying the second coat.
  • Cleaned up: We cleaned up any tools or equipment used for the coating application. We disposed of any unused coating or packaging properly.
  • Inspected the roof: Once the coating was dry, we inspected the roof to ensure that it was evenly coated and there were no areas that needed touch-ups.

This is how our team completed this commercial flat coating project!  Our team also has great experience with Aluminium Coating, Mod-bit and TPO you can see the projects we have completed under those roofing systems too. Partner up with Slog Group!

Project Images

#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1835726/slog-group-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.