Logo

Global CM LLC

Share

Calhan, CO 80808

Company Info

  • Est. 2012
  • Size 10-19 Employees
  • Annual Vol Undisclosed
  • DUNS # 03-872-4643

People Also View These
Loading...

Our Story

We started this business because the industry needed a quality service provider in the Front Range. Having been in the Civil industry for over 30 years, we knew that being different and how we approach projects should not be status quo. Our pride in finding new ways of constructing earthwork projects has enabled us to negotiate with owners, contractors, and businesses. Our safety record, experience, due diligence, and customer satisfaction are exactly why time and again customers continue to support Global CM, LLC. One thing is for sure, you will always get prompt, reliable, and efficient service.

We provide complete civil projects:

  • Government
  • Design/Build
  • Construction Management
  • Change of Use (CUP)
  • Earthwork
  • Demolition
  • Trucking/Hauling
  • Residential Construction
  • Sanitary Sewer Cleaning
  • Camera Inspecting
  • Certified Fire Line/Main Line Underground Utility Installer (NFPA 24 Licensed)

What We Do

Commercial Experience

Bank Civil & Site Development Gas Station Government Hotel / Motel Manufacturing Plant Utilities
Apartments & Condominiums Assisted Living Church / Synagogue Club House / Community Center Golf Course Grocery Stores House Industrial Maintenance Medical Office Misc Project Mixed Use Non-Building Construction Non-Residential Building Office Building Park / Playground Residential Building Restaurant Retail Store Road / Highway Single Family Residential Storage Facility / Warehouse

Regions & Counties Serviced

  • Colorado and Wyoming

Colorado All

Our CSI Codes

01 94 13 - Facility Decommissioning Procedures
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 00 00 - Transportation
35 41 16 - Levee Cutoff Trenches
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs
  • Projects Up to $10,000,000
  • LEED Experience
  • BIM Experience

Gallery

Featured Image 1
Widefield Water and Sanitation District
Featured Image 2
Services
Featured Image 3
Pictures
Featured Image 4
24" Cut-in Mainline Pipe
Service Area and Locations Map for Global CM LLC

Associations & Memberships

NFPA (National Fire Protection Assn.)
NFPA (National Fire Protection Assn.)
Licensed & Insured
Licensed & Insured
Civil
Civil

Preferred Brands

Sunstate Equipment
Sunstate Equipment
Wagner Machinery
Wagner Machinery
John Deere
John Deere
Share URL copied!
https://www.thebluebook.com/iProView/1748407/global-cm-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.