Featured Project Return to Projects List
Apartment Remodeling
Project Information
- Project Location:
- Doral, FL
- Status:
- In-Progress
- Structure Type:
- Residential Building
References
- Architect:
- Ramos Architects & Associates
- General Contractor:
- Neo Construction Group Corp
Scope Of Work
THE SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
- Architectural
- General Area: Install new tile flooring and base throughout remodeling area. Prime and paint walls and ceiling throughout the unit.
- Master Bathroom Area: Install new partitions and doors as shown on plans. Install new walk in closet. Install new vanity, reinstall existing sink and install new sink, toilet, shower pan and shower enclosure. Cement board to be installed in wet areas. Install new drop ceiling area matching with existing and install new light fixtures.
- New Powder Room: Install new sink and new toilet. Cement board to be installed in wet areas.
- Existing Laundry Area: Install new laundry sink
- Electrical
- New lighting fixtures to be installed and connected to existing electrical panel
- Plumbing
- Install new fixtures in master bathroom, powder room and kitchen. Install new sink in laundry room, Connect to existing line.