Maricopa Community Colleges District Office Cabling Upgrade Project
Project Information
- Project Location:
- Tempe, AZ
- Approx Contract:
- $250,000
- Status:
- Completed - Jan 2005
- Structure Type:
- School / College / University
References
- Owner:
- Maricopa Community Colleges
- General Contractor:
- CTS
Scope Of Work
Corporate Technology Solutions was awarded the contract to supply and install the structured cabling system for the Maricopa Community Colleges District office, just east of Phoenix in Tempe. The project objective was to update the structured cabling system infrastructure from a CAT3/CAT5 cable infrastructure to a CAT 6 infrastructure to support the installation of a new VOIP system and increase the bandwidth required for new applications.
1,100 work area locations consisting of (2) CAT6.
6 telecommunication closets – 6 floors
Cable Demolition of the old cabling infrastructure
New in-ceiling cable support system